ITAC Assessment: RU0083
ITAC logo
ITAC Assessment: RU0083
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product METAL FASTERNERS
NAICS
n/a
SIC 3429: Hardware, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 195
Plant Area
n/a
Annual Production 300,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $287,119 3,825,616
kWh
Natural Gas $294,371 57,742
MMBtu
Fuel Oil #2 $27,721 6,021
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $96,042 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,062

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,358 $325 $2,358
31,360
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,191 $2,368 $2,191
29,308
kWh
-
03 2.8113: Purchase gas directly from a contract gas supplier $51,967 $50,000 - $51,967
-
MMBtu
04 2.7229: Air condition only space necessary $3,851 $6,100 - $3,851
-
MMBtu
05 2.2414: Use waste heat from hot flue gases to preheat $14,994 $17,800 - $14,994
-
MMBtu
06 2.1233: Analyze flue gas for proper air/fuel ratio $17,662 - - $17,662
-
MMBtu
07 2.4231: Reduce the pressure of compressed air to the minimum required $3,019 - $3,019
40,152
kWh
-
TOTAL RECOMMENDED $96,042 $76,593 $7,568
100,820
kWh
$88,474
-
MMBtu
TOTAL IMPLEMENTED $26,062 $8,793 $4,549
60,668
kWh
$21,513
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs