| Assessment Year | 1990 |
|---|---|
| Principal Product | METAL FASTERNERS |
| NAICS |
n/a
|
| SIC | 3429: Hardware, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 195 |
| Plant Area |
n/a
|
| Annual Production | 300,000
pieces
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | New York |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $287,119 | 3,825,616 |
kWh
|
$0.075 |
| Natural Gas | $294,371 | 57,742 |
MMBtu
|
$5.10 |
| Fuel Oil #2 | $27,721 | 6,021 |
MMBtu
|
$4.60 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $96,042 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $26,062 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,358 | $325 |
$2,358
31,360
kWh
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,191 | $2,368 |
$2,191
29,308
kWh
|
- | |
| 03 | 2.8113: Purchase gas directly from a contract gas supplier | $51,967 | $50,000 | - |
$51,967
-
MMBtu
|
|
| 04 | 2.7229: Air condition only space necessary | $3,851 | $6,100 | - |
$3,851
-
MMBtu
|
|
| 05 | 2.2414: Use waste heat from hot flue gases to preheat | $14,994 | $17,800 | - |
$14,994
-
MMBtu
|
|
| 06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $17,662 | - | - |
$17,662
-
MMBtu
|
|
| 07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,019 | - |
$3,019
40,152
kWh
|
- | |
| TOTAL RECOMMENDED | $96,042 | $76,593 |
$7,568
100,820
kWh
|
$88,474
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $26,062 | $8,793 |
$4,549
60,668
kWh
|
$21,513
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs