Assessment Year | 1990 |
---|---|
Principal Product | THERMOPLASTIC PARTS |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 115 |
Plant Area |
n/a
|
Annual Production | 100,000
pieces
|
Production Hrs. Annual | 3,920
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $140,940 | 1,423,212 |
kWh
|
$0.099 |
Fuel Oil #4 | $40,755 | 11,236 |
MMBtu
|
$3.63 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $15,808 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,599 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #4 Savings |
---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,666 | $650 |
$3,666
36,928
kWh
|
- | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,179 | $500 | - |
$3,179
-
MMBtu
|
|
03 | 2.4312: Improve lubrication practices | $699 | $800 |
$699
7,034
kWh
|
- | |
04 | 2.2136: Install / repair insulation on steam lines | $229 | $81 | - |
$229
-
MMBtu
|
|
05 | 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle | $1,331 | $412 | - |
$1,331
-
MMBtu
|
|
06 | 2.2122: Install / repair insulation on condensate lines | $420 | $279 | - |
$420
-
MMBtu
|
|
07 | 2.2135: Repair and eliminate steam leaks | $6,284 | $325 | - |
$6,284
-
MMBtu
|
|
TOTAL RECOMMENDED | $15,808 | $3,047 |
$4,365
43,962
kWh
|
$11,443
-
MMBtu
|
||
TOTAL IMPLEMENTED | $10,599 | $1,335 |
$3,666
36,928
kWh
|
$6,933
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #4 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs