ITAC Assessment: RU0076
ITAC logo
ITAC Assessment: RU0076
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product THERMOPLASTIC PARTS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 115
Plant Area
n/a
Annual Production 100,000
pieces
Production Hrs. Annual 3,920
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $140,940 1,423,212
kWh
Fuel Oil #4 $40,755 11,236
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,808 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,599

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #4 Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,666 $650 $3,666
36,928
kWh
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $3,179 $500 - $3,179
-
MMBtu
03 2.4312: Improve lubrication practices $699 $800 $699
7,034
kWh
-
04 2.2136: Install / repair insulation on steam lines $229 $81 - $229
-
MMBtu
05 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $1,331 $412 - $1,331
-
MMBtu
06 2.2122: Install / repair insulation on condensate lines $420 $279 - $420
-
MMBtu
07 2.2135: Repair and eliminate steam leaks $6,284 $325 - $6,284
-
MMBtu
TOTAL RECOMMENDED $15,808 $3,047 $4,365
43,962
kWh
$11,443
-
MMBtu
TOTAL IMPLEMENTED $10,599 $1,335 $3,666
36,928
kWh
$6,933
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #4 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs