ITAC Assessment: LT8375
ITAC logo
ITAC Assessment: LT8375
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Mouldings, Organizers and Drawer Boxes
NAICS 423710: Hardware Merchant Wholesalers
SIC 5072: Hardware
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 950,783
ft2
Annual Production 208,000
units
Production Hrs. Annual 4,160
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $246,609 2,252,160
kWh
Electricity Demand $74,427 6,956
kW-mo/yr
LPG $713 22
MMBtu
Waste Disposal Costs
Water Usage $2,769 80,470
Tgal
Water Disposal $3,718 38,982
Tgal
TOTAL YEARLY COSTS $328,237
RECOMMENDED SAVINGS* $11,576 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,666 $430 $2,666
24,345
kWh
- -
02 3.6192: Use a less expensive method of waste removal $7,000 $1,232 - - $7,000
03 2.6218: Turn off equipment when not in use $1,910 $3,819 $1,569
14,333
kWh
$421
-
kW-mo/yr
$(-80.4)
TOTAL RECOMMENDED $11,576 $5,481 $4,235
38,678
kWh
$421
-
kW-mo/yr
$6,920
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs