ITAC Assessment: MS0361
ITAC logo
ITAC Assessment: MS0361
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Refrigerators, Freezers
NAICS 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $100
M
to 500
M
# of Employees 445
Plant Area 286,450
ft2
Annual Production 15,000
pieces
Production Hrs. Annual 6,552
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $390,187 7,967,400
kWh
Electricity Demand $234,913 16,387
kW-mo/yr
Electricity Fees $(-57,659.0) -
Natural Gas $61,942 5,726
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $124,400 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $94,881

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $86,285 $59,157 $56,516
1,154,093
kWh
$28,494
-
kW-mo/yr
$1,275 -
02 2.1331: Burn a less expensive grade of fuel $28,668 $57,500 - $69,492
-
kW-mo/yr
$424 $(-41,247.4)
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,596 $322 $8,469
172,937
kWh
- $127 -
04 2.4221: Install compressor air intakes in coolest locations $851 $604 $508
10,375
kWh
$330
-
kW-mo/yr
$13 -
TOTAL RECOMMENDED $124,400 $117,583 $65,493
1,337,405
kWh
$98,316
-
kW-mo/yr
$1,839 $(-41,247.4)
-
MMBtu
TOTAL IMPLEMENTED $94,881 $59,479 $64,985
1,327,030
kWh
$28,494
-
kW-mo/yr
$1,402 -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs