Assessment Year | 2010 |
---|---|
Principal Product | Refrigerators, Freezers |
NAICS | 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen |
SIC | 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment |
Sales Range | $100 M to 500M |
# of Employees | 445 |
Plant Area |
286,450
ft2
|
Annual Production | 15,000
pieces
|
Production Hrs. Annual | 6,552
hrs
|
Location (State) | Mississippi |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $390,187 | 7,967,400 |
kWh
|
$0.049 |
Electricity Demand | $234,913 | 16,387 |
kW-mo/yr
|
$14.34 |
Electricity Fees | $(-57,659.0) | - |
|
- |
Natural Gas | $61,942 | 5,726 |
MMBtu
|
$10.82 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $124,400 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $94,881 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $86,285 | $59,157 |
$56,516
1,154,093
kWh
|
$28,494
-
kW-mo/yr
|
$1,275 | - | |
02 | 2.1331: Burn a less expensive grade of fuel | $28,668 | $57,500 | - |
$69,492
-
kW-mo/yr
|
$424 |
$(-41,247.4)
-
MMBtu
|
|
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,596 | $322 |
$8,469
172,937
kWh
|
- | $127 | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $851 | $604 |
$508
10,375
kWh
|
$330
-
kW-mo/yr
|
$13 | - | |
TOTAL RECOMMENDED | $124,400 | $117,583 |
$65,493
1,337,405
kWh
|
$98,316
-
kW-mo/yr
|
$1,839 |
$(-41,247.4)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $94,881 | $59,479 |
$64,985
1,327,030
kWh
|
$28,494
-
kW-mo/yr
|
$1,402 | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs