ITAC Assessment: RU0061
ITAC logo
ITAC Assessment: RU0061
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product INSTRUMENT COMPONENTS
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 75
Plant Area
n/a
Annual Production 2,000,000
pieces
Production Hrs. Annual 2,340
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $40,065 441,090
kWh
LPG $11,432 1,649
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,693 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,588

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings
01 2.7243: Improve air circulation with destratification fans / other methods $2,588 $2,880 $(-301.0)
(-3,517)
kWh
$2,889
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $785 $203 $785
8,499
kWh
-
03 2.7444: Close holes and openings in building such as broken windows $1,320 - $1,320
14,654
kWh
-
TOTAL RECOMMENDED $4,693 $3,083 $1,804
19,636
kWh
$2,889
-
MMBtu
TOTAL IMPLEMENTED $2,588 $2,880 $(-301.0)
(-3,517)
kWh
$2,889
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs