ITAC Assessment: RU0059
ITAC logo
ITAC Assessment: RU0059
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product PLASTIC BEVERAGE BOTTLES
NAICS
n/a
SIC 3085: Plastics Bottles
Sales Range $50
M
to 100
M
# of Employees 380
Plant Area
n/a
Annual Production 500,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Maryland

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,212,238 26,054,807
kWh
Natural Gas $35,560 6,658
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $138,787 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,000

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.5194: Redesign process $81,076 $84,000 $81,076
1,742,087
kWh
-
02 2.3212: Optimize plant power factor $36,000 $39,000 $36,000
-
kWh
-
03 2.7243: Improve air circulation with destratification fans / other methods $11,797 $16,740 $(-923.0)
(-19,637)
kWh
$12,720
-
MMBtu
04 2.2522: Isolate hot or cold equipment $6,424 $11,590 $6,424
138,042
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,490 $479 $3,490
75,029
kWh
-
TOTAL RECOMMENDED $138,787 $151,809 $126,067
1,935,521
kWh
$12,720
-
MMBtu
TOTAL IMPLEMENTED $36,000 $39,000 $36,000
-
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs