| Assessment Year | 1989 |
|---|---|
| Principal Product | PRECAST CONCRETE UNITS |
| NAICS |
n/a
|
| SIC | 3272: Concrete Products, Except Block and Brick |
| Sales Range | $10 M to 50M |
| # of Employees | 65 |
| Plant Area |
n/a
|
| Annual Production | 2,700
thousand feet
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | New Jersey |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $103,187 | 1,211,606 |
kWh
|
$0.085 |
| Natural Gas | $70,318 | 12,852 |
MMBtu
|
$5.47 |
| Fuel Oil #2 | $43,500 | 7,000 |
MMBtu
|
$6.21 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $19,083 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $18,561 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4312: Improve lubrication practices | $1,628 | $800 |
$1,628
19,050
kWh
|
- | - | |
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $522 | - |
$522
6,155
kWh
|
- | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $544 | - |
$544
6,448
kWh
|
- | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $132 | $92 |
$132
1,465
kWh
|
- | - | |
| 05 | 2.4133: Use most efficient type of electric motors | $488 | $1,125 |
$488
5,862
kWh
|
- | - | |
| 06 | 2.1135: Repair furnaces and oven doors so that they seal efficiently | $12,335 | $260 | - |
$12,335
-
MMBtu
|
- | |
| 07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,434 | $500 | - | - |
$3,434
-
MMBtu
|
|
| TOTAL RECOMMENDED | $19,083 | $2,777 |
$3,314
38,980
kWh
|
$12,335
-
MMBtu
|
$3,434
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $18,561 | $2,777 |
$2,792
32,825
kWh
|
$12,335
-
MMBtu
|
$3,434
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs