ITAC Assessment: RU0049
ITAC logo
ITAC Assessment: RU0049
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product PRECAST CONCRETE UNITS
NAICS
n/a
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area
n/a
Annual Production 2,700
thousand feet
Production Hrs. Annual 4,160
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $103,187 1,211,606
kWh
Natural Gas $70,318 12,852
MMBtu
Fuel Oil #2 $43,500 7,000
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,083 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,561

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.4312: Improve lubrication practices $1,628 $800 $1,628
19,050
kWh
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $522 - $522
6,155
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $544 - $544
6,448
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $132 $92 $132
1,465
kWh
- -
05 2.4133: Use most efficient type of electric motors $488 $1,125 $488
5,862
kWh
- -
06 2.1135: Repair furnaces and oven doors so that they seal efficiently $12,335 $260 - $12,335
-
MMBtu
-
07 2.1233: Analyze flue gas for proper air/fuel ratio $3,434 $500 - - $3,434
-
MMBtu
TOTAL RECOMMENDED $19,083 $2,777 $3,314
38,980
kWh
$12,335
-
MMBtu
$3,434
-
MMBtu
TOTAL IMPLEMENTED $18,561 $2,777 $2,792
32,825
kWh
$12,335
-
MMBtu
$3,434
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs