Assessment Year | 1989 |
---|---|
Principal Product | PRECAST CONCRETE UNITS |
NAICS |
n/a
|
SIC | 3272: Concrete Products, Except Block and Brick |
Sales Range | $10 M to 50M |
# of Employees | 65 |
Plant Area |
n/a
|
Annual Production | 2,700
thousand feet
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $103,187 | 1,211,606 |
kWh
|
$0.085 |
Natural Gas | $70,318 | 12,852 |
MMBtu
|
$5.47 |
Fuel Oil #2 | $43,500 | 7,000 |
MMBtu
|
$6.21 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $19,083 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $18,561 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|---|
01 | 2.4312: Improve lubrication practices | $1,628 | $800 |
$1,628
19,050
kWh
|
- | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $522 | - |
$522
6,155
kWh
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $544 | - |
$544
6,448
kWh
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $132 | $92 |
$132
1,465
kWh
|
- | - | |
05 | 2.4133: Use most efficient type of electric motors | $488 | $1,125 |
$488
5,862
kWh
|
- | - | |
06 | 2.1135: Repair furnaces and oven doors so that they seal efficiently | $12,335 | $260 | - |
$12,335
-
MMBtu
|
- | |
07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,434 | $500 | - | - |
$3,434
-
MMBtu
|
|
TOTAL RECOMMENDED | $19,083 | $2,777 |
$3,314
38,980
kWh
|
$12,335
-
MMBtu
|
$3,434
-
MMBtu
|
||
TOTAL IMPLEMENTED | $18,561 | $2,777 |
$2,792
32,825
kWh
|
$12,335
-
MMBtu
|
$3,434
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs