ITAC Assessment: RU0045
ITAC logo
ITAC Assessment: RU0045
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product GROUND ELEMENTAL SULFUR
NAICS
n/a
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 10
Plant Area
n/a
Annual Production 8,000
ton
Production Hrs. Annual 2,600
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $51,686 462,192
kWh
Natural Gas $15,970 3,008
MMBtu
Fuel Oil #2 $23,832 6,542
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,240 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,170

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,025 - $1,025
9,379
kWh
-
02 2.4312: Improve lubrication practices $356 $800 $356
3,224
kWh
-
03 2.2443: Re-use or recycle hot or cold process exhaust air $2,714 $11,000 - $2,714
-
MMBtu
04 2.4133: Use most efficient type of electric motors $549 $1,038 $549
4,982
kWh
-
05 2.1233: Analyze flue gas for proper air/fuel ratio $596 $500 - $596
-
MMBtu
TOTAL RECOMMENDED $5,240 $13,338 $1,930
17,585
kWh
$3,310
-
MMBtu
TOTAL IMPLEMENTED $2,170 $1,538 $1,574
14,361
kWh
$596
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs