ITAC Assessment: RU0044
ITAC logo
ITAC Assessment: RU0044
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product CONCRETE PIPES
NAICS
n/a
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $5
M
to 10
M
# of Employees 55
Plant Area
n/a
Annual Production 78,000
ton
Production Hrs. Annual 3,162
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $89,908 834,994
kWh
Natural Gas $5,527 925
MMBtu
Fuel Oil #2 $18,179 3,905
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,608 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,013

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.4312: Improve lubrication practices $1,840 $800 $1,840
18,464
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,908 - $2,908
26,964
kWh
-
03 2.2136: Install / repair insulation on steam lines $1,286 $390 - $1,286
-
MMBtu
04 2.7243: Improve air circulation with destratification fans / other methods $3,369 $3,400 $(-267.0)
(-2,345)
kWh
$3,636
-
MMBtu
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,386 - $2,386
21,981
kWh
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $456 - $456
4,103
kWh
-
07 2.1233: Analyze flue gas for proper air/fuel ratio $363 $500 - $363
-
MMBtu
TOTAL RECOMMENDED $12,608 $5,090 $7,323
69,167
kWh
$5,285
-
MMBtu
TOTAL IMPLEMENTED $5,013 $890 $3,364
31,067
kWh
$1,649
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs