Assessment Year | 1988 |
---|---|
Principal Product | PLUMBING FIXTURES |
NAICS |
n/a
|
SIC | 3432: Plumbing Fixture Fittings and Trim |
Sales Range | $10 M to 50M |
# of Employees | 220 |
Plant Area |
n/a
|
Annual Production | 2,580,000
lb
|
Production Hrs. Annual | 2,210
hrs
|
Location (State) | Delaware |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $99,526 | 1,417,057 |
kWh
|
$0.070 |
Natural Gas | $3,760 | 721 |
MMBtu
|
$5.21 |
Fuel Oil #2 | $11,624 | 2,520 |
MMBtu
|
$4.61 |
Fuel Oil #4 | $38,254 | 10,541 |
MMBtu
|
$3.63 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $12,043 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,534 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings | Fuel Oil #4 Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $304 | - |
$304
4,396
kWh
|
- | - | - | |
02 | 2.6211: Conserve energy by efficient use of vending machines | $722 | $800 |
$722
10,258
kWh
|
- | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,285 | - |
$2,285
32,532
kWh
|
- | - | - | |
04 | 2.7111: Reduce illumination to minimum necessary levels | $2,583 | - |
$2,583
36,928
kWh
|
- | - | - | |
05 | 2.7492: Use proper thickness of insulation on building envelope | $1,235 | $1,040 | - | - | - |
$1,235
-
MMBtu
|
|
06 | 2.2511: Insulate bare equipment | $248 | $501 | - | - |
$248
-
MMBtu
|
- | |
07 | 2.7243: Improve air circulation with destratification fans / other methods | $3,785 | $1,260 | - |
$2,262
-
MMBtu
|
- |
$1,523
-
MMBtu
|
|
08 | 2.1233: Analyze flue gas for proper air/fuel ratio | $116 | - | - | - |
$116
-
MMBtu
|
- | |
09 | 2.1233: Analyze flue gas for proper air/fuel ratio | $765 | - | - | - | - |
$765
-
MMBtu
|
|
TOTAL RECOMMENDED | $12,043 | $3,601 |
$5,894
84,114
kWh
|
$2,262
-
MMBtu
|
$364
-
MMBtu
|
$3,523
-
MMBtu
|
||
TOTAL IMPLEMENTED | $9,534 | $1,260 |
$4,868
69,460
kWh
|
$2,262
-
MMBtu
|
$116
-
MMBtu
|
$2,288
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings | Fuel Oil #4 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs