ITAC Assessment: KU0223
ITAC logo
ITAC Assessment: KU0223
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product HI-DENSITY PLASTIC CONTAINERS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 75
Plant Area
n/a
Annual Production 40,000,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $241,053 4,235,053
kWh
Natural Gas $13,060 3,682
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,912 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,305

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4312: Improve lubrication practices $8,607 - $8,607
151,231
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,702 $1,847 $1,702
29,894
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $1,201 $610 $1,201
21,102
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,168 - $1,168
20,516
kWh
-
05 2.4227: Use compressor air filters $884 - $884
15,533
kWh
-
06 2.2511: Insulate bare equipment $544 $102 $650
11,430
kWh
$(-106.0)
-
MMBtu
07 2.1123: Install automatic stack damper $426 $800 - $426
-
MMBtu
08 2.7221: Lower temperature during the winter season and vice-versa $380 - - $380
-
MMBtu
TOTAL RECOMMENDED $14,912 $3,359 $14,212
249,706
kWh
$700
-
MMBtu
TOTAL IMPLEMENTED $6,305 $3,359 $5,605
98,475
kWh
$700
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs