ITAC Assessment: RU0036
ITAC logo
ITAC Assessment: RU0036
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product FIBERGLASS TANKS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 46
Plant Area
n/a
Annual Production 500
pieces
Production Hrs. Annual 3,276
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $77,605 678,781
kWh
Natural Gas $27,299 5,570
MMBtu
Fuel Oil #2 $26,208 4,586
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,127 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,611

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.7229: Air condition only space necessary $2,449 $4,244 $2,449
22,274
kWh
- -
02 2.7492: Use proper thickness of insulation on building envelope $3,900 $26,730 - $3,900
-
MMBtu
-
03 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $2,637 $2,780 $275
2,638
kWh
$2,362
-
MMBtu
-
04 2.7243: Improve air circulation with destratification fans / other methods $2,523 $2,268 $(-456.0)
(-4,103)
kWh
$2,979
-
MMBtu
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,611 - $1,611
14,654
kWh
- -
06 2.6212: Turn off equipment during breaks, reduce operating time $3,145 $2,600 - - $3,145
-
MMBtu
07 2.4322: Use or replace with energy efficient substitutes $9,862 $4,000 $9,862
89,683
kWh
- -
TOTAL RECOMMENDED $26,127 $42,622 $13,741
125,146
kWh
$9,241
-
MMBtu
$3,145
-
MMBtu
TOTAL IMPLEMENTED $1,611 - $1,611
14,654
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs