Assessment Year | 1988 |
---|---|
Principal Product | FIBERGLASS TANKS |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 46 |
Plant Area |
n/a
|
Annual Production | 500
pieces
|
Production Hrs. Annual | 3,276
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $77,605 | 678,781 |
kWh
|
$0.11 |
Natural Gas | $27,299 | 5,570 |
MMBtu
|
$4.90 |
Fuel Oil #2 | $26,208 | 4,586 |
MMBtu
|
$5.71 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $26,127 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,611 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|---|
01 | 2.7229: Air condition only space necessary | $2,449 | $4,244 |
$2,449
22,274
kWh
|
- | - | |
02 | 2.7492: Use proper thickness of insulation on building envelope | $3,900 | $26,730 | - |
$3,900
-
MMBtu
|
- | |
03 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $2,637 | $2,780 |
$275
2,638
kWh
|
$2,362
-
MMBtu
|
- | |
04 | 2.7243: Improve air circulation with destratification fans / other methods | $2,523 | $2,268 |
$(-456.0)
(-4,103)
kWh
|
$2,979
-
MMBtu
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,611 | - |
$1,611
14,654
kWh
|
- | - | |
06 | 2.6212: Turn off equipment during breaks, reduce operating time | $3,145 | $2,600 | - | - |
$3,145
-
MMBtu
|
|
07 | 2.4322: Use or replace with energy efficient substitutes | $9,862 | $4,000 |
$9,862
89,683
kWh
|
- | - | |
TOTAL RECOMMENDED | $26,127 | $42,622 |
$13,741
125,146
kWh
|
$9,241
-
MMBtu
|
$3,145
-
MMBtu
|
||
TOTAL IMPLEMENTED | $1,611 | - |
$1,611
14,654
kWh
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs