ITAC Assessment: RU0030
ITAC logo
ITAC Assessment: RU0030
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product FLEXIBLE PACKAGING MTRLS
NAICS
n/a
SIC 2671: Packaging Paper and Plastics Film, Coated and Laminated
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area
n/a
Annual Production 5,000,000
lb
Production Hrs. Annual 6,120
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $257,715 3,334,994
kWh
Natural Gas $32,558 6,408
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,743 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,333

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $706 - $706
9,086
kWh
-
02 2.4312: Improve lubrication practices $1,333 $1,200 $1,333
17,292
kWh
-
03 2.2511: Insulate bare equipment $2,980 $167 $2,980
38,687
kWh
-
04 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $20,724 $17,000 $11,799
153,283
kWh
$8,925
-
MMBtu
TOTAL RECOMMENDED $25,743 $18,367 $16,818
218,348
kWh
$8,925
-
MMBtu
TOTAL IMPLEMENTED $1,333 $1,200 $1,333
17,292
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs