ITAC Assessment: RU0009
ITAC logo
ITAC Assessment: RU0009
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product LIQUID MILK PRODUCTS
NAICS
n/a
SIC 2023: Dry, Condensed, and Evaporated Dairy Products
Sales Range $10
M
to 50
M
# of Employees 45
Plant Area
n/a
Annual Production 8,000,000
Tgal
Production Hrs. Annual 0
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $343,050 5,077,081
kWh
Natural Gas $11,103 2,107
MMBtu
Fuel Oil #6 $116,695 35,097
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,092 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,392

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2441: Preheat boiler makeup water with waste process heat $4,150 $4,392 - $4,150
-
MMBtu
02 2.4237: Substitute compressed air cooling with water or air cooling $410 $125 $410
6,155
kWh
-
03 2.4312: Improve lubrication practices $1,609 $1,600 $1,609
24,033
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,243 - $2,243
33,118
kWh
-
05 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $140 $300 $140
2,052
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,540 $279 $2,540
37,515
kWh
-
TOTAL RECOMMENDED $11,092 $6,696 $6,942
102,873
kWh
$4,150
-
MMBtu
TOTAL IMPLEMENTED $6,392 $1,879 $6,392
94,666
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs