ITAC Assessment: DS0075
ITAC logo
ITAC Assessment: DS0075
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Polyethylene and Fiberglass Tanks
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 70
Plant Area 113,000
ft2
Annual Production 60,000
pieces
Production Hrs. Annual 4,472
hrs
Location (State) South Dakota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $53,497 1,745,311
kWh
Electricity Demand $51,228 6,984
kW-mo/yr
Electricity Fees $8,772 -
Natural Gas $41,999 11,994
MMBtu
LPG $64,904 9,525
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,971 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,857

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.3212: Optimize plant power factor $2,348 $1,700 - - $2,348 - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,487 $21,753 $3,232
104,338
kWh
$2,255
-
kW-mo/yr
- - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,576 $8,500 $643
20,809
kWh
- - $7,933
-
MMBtu
-
04 3.1175: Use a different or recycled raw material $21,114 - - - - - $21,114
-
lb
05 2.6232: Install set-back timers $2,926 $150 - - - $2,926
-
MMBtu
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $1,520 - - - - $1,520
-
MMBtu
-
TOTAL RECOMMENDED $41,971 $32,103 $3,875
125,147
kWh
$2,255
-
kW-mo/yr
$2,348 $12,379
-
MMBtu
$21,114
-
lb
TOTAL IMPLEMENTED $20,857 $32,103 $3,875
125,147
kWh
$2,255
-
kW-mo/yr
$2,348 $12,379
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs