ITAC Assessment: RU0007
ITAC logo
ITAC Assessment: RU0007
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product EDGED METAL PIECES
NAICS
n/a
SIC 3441: Fabricated Structural Metal
Sales Range $1
M
to 5
M
# of Employees 70
Plant Area
n/a
Annual Production 8,100,200
pieces
Production Hrs. Annual 2,210
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $77,235 681,125
kWh
Fuel Oil #2 $17,873 3,920
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,753 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,753

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $774 $180 $774
6,741
kWh
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,804 - $2,804
24,912
kWh
- -
03 2.7243: Improve air circulation with destratification fans / other methods $2,720 $5,000 - $2,720
-
MMBtu
-
04 2.4312: Improve lubrication practices $455 - $695
6,155
kWh
- $(-240.0)
TOTAL RECOMMENDED $6,753 $5,180 $4,273
37,808
kWh
$2,720
-
MMBtu
$(-240.0)
TOTAL IMPLEMENTED $6,753 $5,180 $4,273
37,808
kWh
$2,720
-
MMBtu
$(-240.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs