ITAC Assessment: ORC010
ITAC logo
ITAC Assessment: ORC010
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Support Services
NAICS 611210: Junior Colleges
SIC 8222: Junior Colleges and Technical Institutes
Sales Range less than $500
k
# of Employees 30
Plant Area 44,240
ft2
Annual Production 100
pieces
Production Hrs. Annual 3,380
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $45,843 763,440
kWh
Electricity Demand $14,557 1,878
kW-mo/yr
Electricity Fees $8,405 -
Natural Gas $31,394 4,034
MMBtu
TOTAL YEARLY COSTS $100,199
RECOMMENDED SAVINGS* $31,760 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,690

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,713 $12,000 $1,650
27,479
kWh
$63
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $1,211 $2,500 $1,211
20,163
kWh
- -
03 2.1224: Replace boiler $3,391 $30,000 - - $3,391
-
MMBtu
04 2.7264: Interlock heating and air conditioning systems to prevent simultaneous operation $8,755 $1,000 $4,720
78,609
kWh
- $4,035
-
MMBtu
05 2.2437: Recover waste heat from equipment $16,690 - $643
10,704
kWh
- $16,047
-
MMBtu
TOTAL RECOMMENDED $31,760 $45,500 $8,224
136,955
kWh
$63
-
kW-mo/yr
$23,473
-
MMBtu
TOTAL IMPLEMENTED $16,690 - $643
10,704
kWh
- $16,047
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs