| Assessment Year | 2018 |
|---|---|
| Principal Product | Plastic kitchen and trash bags |
| NAICS | 326111: Plastics Bag and Pouch Manufacturing |
| SIC | 2673: Plastics, Foil, and Coated Paper Bags |
| Sales Range | $100 M to 500M |
| # of Employees | 470 |
| Plant Area |
238,000
ft2
|
| Annual Production | 60,000,000
lb
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Virginia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,029,036 | 31,587,450 |
kWh
|
$0.033 |
| Electricity Demand | $690,549 | 49,460 |
kW-mo/yr
|
$13.96 |
| Natural Gas | $20,965 | 2,714 |
MMBtu
|
$7.72 |
| TOTAL YEARLY COSTS | $1,740,550 | |||
| RECOMMENDED SAVINGS* | $89,389 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $75,098 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $58,179 | $92,653 |
$28,825
884,217
kWh
|
$22,180
-
kW-mo/yr
|
- | $7,174 | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $12,370 | $200 |
$7,925
243,090
kWh
|
$4,645
-
kW-mo/yr
|
$(-100.0) | $(-100.0) | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $7,064 | $100 |
$4,454
136,616
kWh
|
$2,610
-
kW-mo/yr
|
- | - | |
| 04 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $7,227 | $35,000 |
$7,227
221,699
kWh
|
- | - | - | |
| 05 | 2.4151: Develop a repair/replace policy | $2,887 | $5,685 |
$1,792
54,960
kWh
|
$1,095
-
kW-mo/yr
|
- | - | |
| 06 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $1,662 | $200 |
$336
-
kWh
|
$1,326
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $89,389 | $133,838 |
$50,559
1,540,582
kWh
|
$31,856
-
kW-mo/yr
|
$(-100.0) | $7,074 | ||
| TOTAL IMPLEMENTED | $75,098 | $98,738 |
$38,878
1,182,267
kWh
|
$29,246
-
kW-mo/yr
|
$(-100.0) | $7,074 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs