ITAC Assessment: NC0611
ITAC logo
ITAC Assessment: NC0611
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Plastic kitchen and trash bags
NAICS 326111: Plastics Bag and Pouch Manufacturing
SIC 2673: Plastics, Foil, and Coated Paper Bags
Sales Range $100
M
to 500
M
# of Employees 470
Plant Area 238,000
ft2
Annual Production 60,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,029,036 31,587,450
kWh
Electricity Demand $690,549 49,460
kW-mo/yr
Natural Gas $20,965 2,714
MMBtu
TOTAL YEARLY COSTS $1,740,550
RECOMMENDED SAVINGS* $89,389 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $75,098

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $58,179 $92,653 $28,825
884,217
kWh
$22,180
-
kW-mo/yr
- $7,174
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $12,370 $200 $7,925
243,090
kWh
$4,645
-
kW-mo/yr
$(-100.0) $(-100.0)
03 2.4231: Reduce the pressure of compressed air to the minimum required $7,064 $100 $4,454
136,616
kWh
$2,610
-
kW-mo/yr
- -
04 2.2614: Use cooling tower or economizer to replace chiller cooling $7,227 $35,000 $7,227
221,699
kWh
- - -
05 2.4151: Develop a repair/replace policy $2,887 $5,685 $1,792
54,960
kWh
$1,095
-
kW-mo/yr
- -
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,662 $200 $336
-
kWh
$1,326
-
kW-mo/yr
- -
TOTAL RECOMMENDED $89,389 $133,838 $50,559
1,540,582
kWh
$31,856
-
kW-mo/yr
$(-100.0) $7,074
TOTAL IMPLEMENTED $75,098 $98,738 $38,878
1,182,267
kWh
$29,246
-
kW-mo/yr
$(-100.0) $7,074
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs