ITAC Assessment: ORC002
ITAC logo
ITAC Assessment: ORC002
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product outdoor recreational equipment
NAICS 451110: Sporting Goods Stores
SIC 5311: Department Stores
Sales Range less than $500
k
# of Employees 100
Plant Area 124,000
ft2
Annual Production 1
units
Production Hrs. Annual 4,368
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $82,418 2,836,800
kWh
Electricity Demand $22,180 6,323
kW-mo/yr
Electricity Fees $25,959 -
Natural Gas $3,390 354
MMBtu
TOTAL YEARLY COSTS $133,947
RECOMMENDED SAVINGS* $12,321 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,504 $26,686 $5,392
185,916
kWh
$112
-
kW-mo/yr
-
02 2.7261: Install timers and/or thermostats $390 $300 $390
13,440
kWh
- -
03 2.7314: Reduce ventilation air $4,722 $300 $1,520
50,683
kWh
- $3,202
-
MMBtu
04 2.7241: Install outside air damper / economizer on hvac unit $1,705 $8,500 $1,705
58,806
kWh
- -
TOTAL RECOMMENDED $12,321 $35,786 $9,007
308,845
kWh
$112
-
kW-mo/yr
$3,202
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs