ITAC Assessment: OK0632
ITAC logo
ITAC Assessment: OK0632
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Package Buildings, Curtain Walls, Exterior Finishes
NAICS
n/a
SIC 2435: Hardwood Veneer and Plywood
Sales Range $5
M
to 10
M
# of Employees 40
Plant Area 112,000
ft2
Annual Production 600
thousand feet
Production Hrs. Annual 1,300
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $49,029 734,925
kWh
Electricity Demand $84 -
Electricity Fees $3,223 -
Natural Gas $12,471 5,615
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $59,957 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $37,460

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
01 2.7135: Install occupancy sensors $130 $500 $130
1,934
kWh
- -
02 2.6232: Install set-back timers $2,867 $250 - $2,867
-
MMBtu
-
03 2.2437: Recover waste heat from equipment $451 $2,456 - $451
-
MMBtu
-
04 2.7124: Make a practice of turning off lights when not needed $936 - $936
14,040
kWh
- -
05 2.6232: Install set-back timers $3,073 $940 - $1,773
-
MMBtu
$1,300
06 4.423: Move product using mechanical means $11,700 $2,112 - - $11,700
07 4.426: Modify workload $1,800 - - - $1,800
08 4.423: Move product using mechanical means $19,500 $2,500 - - $19,500
09 4.321: Optimize production lot sizes and inventories $19,500 $2,305 - - $19,500
TOTAL RECOMMENDED $59,957 $11,063 $1,066
15,974
kWh
$5,091
-
MMBtu
$53,800
TOTAL IMPLEMENTED $37,460 $8,008 $936
14,040
kWh
$2,224
-
MMBtu
$34,300
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs