ITAC Assessment: OR0803
ITAC logo
ITAC Assessment: OR0803
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product cheese, whey powder, ice cream
NAICS 311513: Cheese Manufacturing
SIC 2022: Natural, Processed, and Imitation Cheese
Sales Range $100
M
to 500
M
# of Employees 563
Plant Area 333,974
ft2
Annual Production 110,900,000
units
Production Hrs. Annual 8,712
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,825,952 56,959,306
kWh
Electricity Demand $435,939 86,586
kW-mo/yr
Electricity Fees $27,721 -
LPG $1,405,407 107,578
MMBtu
Other Energy $707,781 24,979
MMBtu
TOTAL YEARLY COSTS $5,402,800
RECOMMENDED SAVINGS* $99,611 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Energy Savings
01 2.8223: Add air shields to trucks to increase fuel mileage $79,249 $259,200 - - $79,249
-
MMBtu
02 2.2511: Insulate bare equipment $6,565 $7,289 $6,565
143,332
kWh
- -
03 2.2211: Use optimum temperature $6,284 - $6,284
137,202
kWh
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $3,111 - $2,637
53,151
kWh
$474
-
kW-mo/yr
-
05 2.4322: Use or replace with energy efficient substitutes $2,591 $3,426 $2,232
46,021
kWh
$359
-
kW-mo/yr
-
06 2.2511: Insulate bare equipment $1,811 $4,166 $1,811
39,547
kWh
- -
TOTAL RECOMMENDED $99,611 $274,081 $19,529
419,253
kWh
$833
-
kW-mo/yr
$79,249
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Energy Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs