ITAC Assessment: AS0109
ITAC logo
ITAC Assessment: AS0109
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Sheet Metal Products
NAICS
n/a
SIC 3444: Sheet Metal Work
Sales Range $5
M
to 10
M
# of Employees 125
Plant Area 55,000
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 8,112
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $252,022 3,398,886
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,576 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,419

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,756 $825 $1,756
26,084
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $14,292 $1,342 $14,292
192,849
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $546 $500 $546
8,206
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,997 $585 $2,997
44,549
kWh
05 2.7135: Install occupancy sensors $7,611 $26,535 $7,611
112,837
kWh
06 2.4133: Use most efficient type of electric motors $374 $2,060 $374
5,569
kWh
TOTAL RECOMMENDED $27,576 $31,847 $27,576
390,094
kWh
TOTAL IMPLEMENTED $19,419 $4,812 $19,419
269,051
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs