ITAC Assessment: OR0752
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Treated Wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 16
Plant Area 1,568,160
ft2
Annual Production 21,900,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $428,141 10,991,600
kWh
Electricity Demand $150,380 23,500
kW-mo/yr
Electricity Fees $3,536 -
LPG $32,937 1,811
MMBtu
TOTAL YEARLY COSTS $614,993
RECOMMENDED SAVINGS* $489,641 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings
01 2.4221: Install compressor air intakes in coolest locations $1,404 $321 $1,124
32,031
kWh
$280
-
kW-mo/yr
- -
02 2.1223: Install smaller boiler (increase high fire duty cycle) $6,067 $14,203 $4,204
119,770
kWh
- - $1,863
-
MMBtu
03 3.6125: Sell combustible waste $482,170 $1,896,000 $(-12,299.0)
(-350,400)
kWh
$(-3,202.0)
-
kW-mo/yr
$(-57,176.0)
-
MMBtu
$554,847
-
MMBtu
TOTAL RECOMMENDED $489,641 $1,910,524 $(-6,971.0)
(-198,599)
kWh
$(-2,922.0)
-
kW-mo/yr
$(-57,176.0)
-
MMBtu
$556,710
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs