ITAC Assessment: OR0746
ITAC logo
ITAC Assessment: OR0746
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Flight Helmets
NAICS 334511: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufactur
SIC 3812: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical Systems and Instruments
Sales Range $100
M
to 500
M
# of Employees 580
Plant Area 135,023
ft2
Annual Production 5,400
units
Production Hrs. Annual 4,500
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $350,269 5,331,880
kWh
Electricity Demand $69,394 11,872
kW-mo/yr
Electricity Fees $37,339 -
Natural Gas $38,785 4,549
MMBtu
Waste Disposal Costs
Water Usage $55,834 1,314
Tgal
TOTAL YEARLY COSTS $551,621
RECOMMENDED SAVINGS* $42,832 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,177

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4226: Use / purchase optimum sized compressor $2,050 $2,975 $1,859
27,145
kWh
$191
-
kW-mo/yr
-
02 3.1161: Eliminate/reduce an operation $2,177 $49 $336
4,907
kWh
- $1,841
-
MMBtu
03 2.9114: Use solar heat to make electricty $38,605 $550,846 $38,605
563,496
kWh
- -
TOTAL RECOMMENDED $42,832 $553,870 $40,800
595,548
kWh
$191
-
kW-mo/yr
$1,841
-
MMBtu
TOTAL IMPLEMENTED $2,177 $49 $336
4,907
kWh
- $1,841
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs