| Assessment Year | 2021 |
|---|---|
| Principal Product | Frozen Vegetables |
| NAICS | 311999: All Other Miscellaneous Food Manufacturing |
| SIC | 2099: Food Preparations, Not Elsewhere Classified |
| Sales Range | $50 M to 100M |
| # of Employees | 200 |
| Plant Area |
150,000
ft2
|
| Annual Production | 250,000
units
|
| Production Hrs. Annual | 6,336
hrs
|
| Location (State) | Oregon |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $541,289 | 13,960,400 |
kWh
|
$0.039 | |
| Electricity Demand | $169,214 | 28,361 |
kW-mo/yr
|
$5.97 | |
| Electricity Fees | $29,884 | - |
|
- | |
| Natural Gas | $70,666 | 11,198 |
MMBtu
|
$6.31 | |
| LPG | $20,667 | 6,912 |
MMBtu
|
$2.99 | |
| Waste Disposal Costs | |||||
| Water Usage | $99,919 | 113,787 |
Tgal
|
$0.88 | |
| Other Liquid (non-haz) | $93,635 | 3,675,196,855 |
gal
|
$0.000 | |
| TOTAL YEARLY COSTS | $1,025,274 | ||||
| RECOMMENDED SAVINGS* | $56,380 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $39,614 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | LPG Savings | Water Usage Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 3.4151: Minimize water usage | $2,348 | - | - | - | - | - |
$2,348
-
Tgal
|
- | - | |
| 02 | 2.3212: Optimize plant power factor | $15,238 | $36,792 | - | - | $15,238 | - | - | - | - | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $16,963 | $2,340 |
$13,113
338,838
kWh
|
$3,850
-
kW-mo/yr
|
- | - | - | - | - | |
| 04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $16,766 | $8,671 |
$14,871
384,256
kWh
|
$1,895
-
kW-mo/yr
|
- | - | - | - | - | |
| 05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $5,065 | $18,105 | - | - | - |
$86
-
MMBtu
|
- | $315 | $4,664 | |
| TOTAL RECOMMENDED | $56,380 | $65,908 |
$27,984
723,094
kWh
|
$5,745
-
kW-mo/yr
|
$15,238 |
$86
-
MMBtu
|
$2,348
-
Tgal
|
$315 | $4,664 | ||
| TOTAL IMPLEMENTED | $39,614 | $57,237 |
$13,113
338,838
kWh
|
$3,850
-
kW-mo/yr
|
$15,238 |
$86
-
MMBtu
|
$2,348
-
Tgal
|
$315 | $4,664 | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs