Assessment Year | 2021 |
---|---|
Principal Product | Frozen Vegetables |
NAICS | 311999: All Other Miscellaneous Food Manufacturing |
SIC | 2099: Food Preparations, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 200 |
Plant Area |
150,000
ft2
|
Annual Production | 250,000
units
|
Production Hrs. Annual | 6,336
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $541,289 | 13,960,400 |
kWh
|
$0.039 | |
Electricity Demand | $169,214 | 28,361 |
kW-mo/yr
|
$5.97 | |
Electricity Fees | $29,884 | - |
|
- | |
Natural Gas | $70,666 | 11,198 |
MMBtu
|
$6.31 | |
LPG | $20,667 | 6,912 |
MMBtu
|
$2.99 | |
Waste Disposal Costs | |||||
Water Usage | $99,919 | 113,787 |
Tgal
|
$0.88 | |
Other Liquid (non-haz) | $93,635 | 3,675,196,855 |
gal
|
$0.000 | |
TOTAL YEARLY COSTS | $1,025,274 | ||||
RECOMMENDED SAVINGS* | $56,380 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $39,614 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | LPG Savings | Water Usage Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 3.4151: Minimize water usage | $2,348 | - | - | - | - | - |
$2,348
-
Tgal
|
- | - | |
02 | 2.3212: Optimize plant power factor | $15,238 | $36,792 | - | - | $15,238 | - | - | - | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $16,963 | $2,340 |
$13,113
338,838
kWh
|
$3,850
-
kW-mo/yr
|
- | - | - | - | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $16,766 | $8,671 |
$14,871
384,256
kWh
|
$1,895
-
kW-mo/yr
|
- | - | - | - | - | |
05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $5,065 | $18,105 | - | - | - |
$86
-
MMBtu
|
- | $315 | $4,664 | |
TOTAL RECOMMENDED | $56,380 | $65,908 |
$27,984
723,094
kWh
|
$5,745
-
kW-mo/yr
|
$15,238 |
$86
-
MMBtu
|
$2,348
-
Tgal
|
$315 | $4,664 | ||
TOTAL IMPLEMENTED | $39,614 | $57,237 |
$13,113
338,838
kWh
|
$3,850
-
kW-mo/yr
|
$15,238 |
$86
-
MMBtu
|
$2,348
-
Tgal
|
$315 | $4,664 |