ITAC Assessment: OR0744
ITAC logo
ITAC Assessment: OR0744
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Frozen Vegetables
NAICS 311999: All Other Miscellaneous Food Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 150,000
ft2
Annual Production 250,000
units
Production Hrs. Annual 6,336
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $541,289 13,960,400
kWh
Electricity Demand $169,214 28,361
kW-mo/yr
Electricity Fees $29,884 -
Natural Gas $70,666 11,198
MMBtu
LPG $20,667 6,912
MMBtu
Waste Disposal Costs
Water Usage $99,919 113,787
Tgal
Other Liquid (non-haz) $93,635 3,675,196,855
gal
TOTAL YEARLY COSTS $1,025,274
RECOMMENDED SAVINGS* $56,380 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $39,614

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings LPG Savings Water Usage Savings Personnel Changes Savings Ancillary Material Cost Savings
01 3.4151: Minimize water usage $2,348 - - - - - $2,348
-
Tgal
- -
02 2.3212: Optimize plant power factor $15,238 $36,792 - - $15,238 - - - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $16,963 $2,340 $13,113
338,838
kWh
$3,850
-
kW-mo/yr
- - - - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $16,766 $8,671 $14,871
384,256
kWh
$1,895
-
kW-mo/yr
- - - - -
05 2.7447: Install vinyl strip / high speed / air curtain doors $5,065 $18,105 - - - $86
-
MMBtu
- $315 $4,664
TOTAL RECOMMENDED $56,380 $65,908 $27,984
723,094
kWh
$5,745
-
kW-mo/yr
$15,238 $86
-
MMBtu
$2,348
-
Tgal
$315 $4,664
TOTAL IMPLEMENTED $39,614 $57,237 $13,113
338,838
kWh
$3,850
-
kW-mo/yr
$15,238 $86
-
MMBtu
$2,348
-
Tgal
$315 $4,664
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs