| Assessment Year | 2020 |
|---|---|
| Principal Product | Treated Wastewater |
| NAICS | 221320: Sewage Treatment Facilities |
| SIC | 4952: Sewerage Systems |
| Sales Range | $10 M to 50M |
| # of Employees | 13 |
| Plant Area |
921,270
ft2
|
| Annual Production | 1,000,000
Tgal
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Oregon |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $244,496 | 4,322,411 |
kWh
|
$0.057 |
| Electricity Demand | $42,369 | 15,017 |
kW-mo/yr
|
$2.82 |
| Electricity Fees | $41,840 | - |
|
- |
| Natural Gas | $35,870 | 5,550 |
MMBtu
|
$6.46 |
| TOTAL YEARLY COSTS | $364,575 | |||
| RECOMMENDED SAVINGS* | $284,345 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $216,029 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.6231: Utilize controls to operate equipment only when needed | $69,219 | $8,189 |
$69,219
1,092,155
kWh
|
- | - | |
| 02 | 2.4321: Upgrade obsolete equipment | $68,316 | $149,022 |
$61,424
969,440
kWh
|
$6,892
-
kW-mo/yr
|
- | |
| 03 | 2.4133: Use most efficient type of electric motors | $54,988 | $79,709 |
$42,558
671,677
kWh
|
$12,430
-
kW-mo/yr
|
- | |
| 04 | 2.4322: Use or replace with energy efficient substitutes | $39,964 | $60,439 |
$37,031
584,449
kWh
|
$2,933
-
kW-mo/yr
|
- | |
| 05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $27,831 | $84,560 |
$27,831
439,252
kWh
|
- | - | |
| 06 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $14,480 | $12,929 |
$14,480
228,535
kWh
|
- | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,547 | $3,289 |
$6,012
94,888
kWh
|
$1,023
-
kW-mo/yr
|
$2,512 | |
| TOTAL RECOMMENDED | $284,345 | $398,137 |
$258,555
4,080,396
kWh
|
$23,278
-
kW-mo/yr
|
$2,512 | ||
| TOTAL IMPLEMENTED | $216,029 | $249,115 |
$197,131
3,110,956
kWh
|
$16,386
-
kW-mo/yr
|
$2,512 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs