ITAC Assessment: LE0139
ITAC logo
ITAC Assessment: LE0139
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Building Face Brick
NAICS
n/a
SIC 3251: Brick and Structural Clay Tile
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 166,250
ft2
Annual Production 19,500,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Maryland

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $89,552 3,265,810
kWh
Electricity Demand $119,610 10,435
kW-mo/yr
Natural Gas $697,708 108,580
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $103,244 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $98,492

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 4.652: Replace existing equipment with more suitable substitutes $97,133 $238,263 - - $65,133 $32,000
02 2.4221: Install compressor air intakes in coolest locations $883 $2,000 $273
9,937
kWh
$610
-
kW-mo/yr
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,359 - $488
17,659
kWh
$871
-
kW-mo/yr
- -
04 2.4112: Install soft-start to eliminate nuisance trips $3,869 $7,000 - $3,869
-
kW-mo/yr
- -
TOTAL RECOMMENDED $103,244 $247,263 $761
27,596
kWh
$5,350
-
kW-mo/yr
$65,133 $32,000
TOTAL IMPLEMENTED $98,492 $238,263 $488
17,659
kWh
$871
-
kW-mo/yr
$65,133 $32,000
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs