ITAC Assessment: OR0731
ITAC logo
ITAC Assessment: OR0731
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Asphalt
NAICS 324121: Asphalt Paving Mixture and Block Manufacturing
SIC 3273: Ready-Mixed Concrete
Sales Range $1
M
to 5
M
# of Employees 80
Plant Area 5,647,258
ft2
Annual Production 65,000
units
Production Hrs. Annual 1,200
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $69,196 920,920
kWh
Electricity Demand $12,946 3,819
kW-mo/yr
Electricity Fees $29,237 -
Natural Gas $284,105 65,382
MMBtu
TOTAL YEARLY COSTS $395,484
RECOMMENDED SAVINGS* $403,863 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Product Savings
01 4.111: Add equipment/ operators to reduce production bottleneck $400,247 $579,059 $1,547
22,302
kWh
- - $398,700
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,777 $55 $962
13,874
kWh
$815
-
kW-mo/yr
- -
03 2.4226: Use / purchase optimum sized compressor $1,289 $1,924 $1,165
16,797
kWh
$124
-
kW-mo/yr
- -
04 2.2511: Insulate bare equipment $550 $419 - - $550
-
MMBtu
-
TOTAL RECOMMENDED $403,863 $581,457 $3,674
52,973
kWh
$939
-
kW-mo/yr
$550
-
MMBtu
$398,700
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs