Assessment Year | 2019 |
---|---|
Principal Product | Beer |
NAICS | 312120: Breweries |
SIC | 2082: Malt Beverages |
Sales Range | $100 M to 500M |
# of Employees | 200 |
Plant Area |
60,000
ft2
|
Annual Production | 300,000
units
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $278,475 | 5,254,239 |
kWh
|
$0.053 | |
Electricity Demand | $4 | 1 |
kW-mo/yr
|
$3.85 | |
Natural Gas | $202,161 | 47,388 |
MMBtu
|
$4.27 | |
Waste Disposal Costs | |||||
Water Usage | $106,732 | 41,152 |
Tgal
|
$2.59 | |
Water Disposal | $13,982 | 2,696 |
Tgal
|
$5.19 | |
TOTAL YEARLY COSTS | $601,354 | ||||
RECOMMENDED SAVINGS* | $243,036 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $1,163 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Water Disposal Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.2694: Use highest temperature for chilling or cold storage | $1,163 | - |
$1,065
20,101
kWh
|
$98
-
kW-mo/yr
|
- | - | - | - | |
02 | 3.4151: Minimize water usage | $20,973 | $587 | - | - | - |
$6,991
-
Tgal
|
$13,982
-
Tgal
|
- | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $14,061 | $7,650 |
$14,061
203,831
kWh
|
- | - | - | - | - | |
04 | 2.6231: Utilize controls to operate equipment only when needed | $2,624 | $3,273 |
$571
10,769
kWh
|
- |
$2,053
-
MMBtu
|
- | - | - | |
05 | 3.5311: Recover and reuse waste material | $204,215 | $143,400 |
$(-32,035.0)
(-604,440)
kWh
|
- | - | - | - | $236,250 | |
TOTAL RECOMMENDED | $243,036 | $154,910 |
$(-16,338.0)
(-369,739)
kWh
|
$98
-
kW-mo/yr
|
$2,053
-
MMBtu
|
$6,991
-
Tgal
|
$13,982
-
Tgal
|
$236,250 | ||
TOTAL IMPLEMENTED | $1,163 | - |
$1,065
20,101
kWh
|
$98
-
kW-mo/yr
|
- | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs