ITAC Assessment: OR0717
ITAC logo
ITAC Assessment: OR0717
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Beer
NAICS 312120: Breweries
SIC 2082: Malt Beverages
Sales Range $100
M
to 500
M
# of Employees 200
Plant Area 60,000
ft2
Annual Production 300,000
units
Production Hrs. Annual 7,200
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $278,475 5,254,239
kWh
Electricity Demand $4 1
kW-mo/yr
Natural Gas $202,161 47,388
MMBtu
Waste Disposal Costs
Water Usage $106,732 41,152
Tgal
Water Disposal $13,982 2,696
Tgal
TOTAL YEARLY COSTS $601,354
RECOMMENDED SAVINGS* $243,036 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,163

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Primary Raw Material Savings
01 2.2694: Use highest temperature for chilling or cold storage $1,163 - $1,065
20,101
kWh
$98
-
kW-mo/yr
- - - -
02 3.4151: Minimize water usage $20,973 $587 - - - $6,991
-
Tgal
$13,982
-
Tgal
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $14,061 $7,650 $14,061
203,831
kWh
- - - - -
04 2.6231: Utilize controls to operate equipment only when needed $2,624 $3,273 $571
10,769
kWh
- $2,053
-
MMBtu
- - -
05 3.5311: Recover and reuse waste material $204,215 $143,400 $(-32,035.0)
(-604,440)
kWh
- - - - $236,250
TOTAL RECOMMENDED $243,036 $154,910 $(-16,338.0)
(-369,739)
kWh
$98
-
kW-mo/yr
$2,053
-
MMBtu
$6,991
-
Tgal
$13,982
-
Tgal
$236,250
TOTAL IMPLEMENTED $1,163 - $1,065
20,101
kWh
$98
-
kW-mo/yr
- - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs