| Assessment Year | 2018 |
|---|---|
| Principal Product | Whey Protien, Lactose Powder |
| NAICS | 311514: Dry, Condensed, and Evaporated Dairy Product Manufacturing |
| SIC | 2023: Dry, Condensed, and Evaporated Dairy Products |
| Sales Range | $100 M to 500M |
| # of Employees | 50 |
| Plant Area |
109,000
ft2
|
| Annual Production | 50,000,000
lb
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Oregon |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $661,747 | 17,414,000 |
kWh
|
$0.038 | |
| Electricity Demand | $196,599 | 32,767 |
kW-mo/yr
|
$6.00 | |
| Electricity Fees | $26,183 | - |
|
- | |
| Natural Gas | $400,099 | 68,841 |
MMBtu
|
$5.81 | |
| Other Energy | $469,756 | 143,562 |
MMBtu
|
$3.27 | |
| Waste Disposal Costs | |||||
| Water Usage | $104,918 | 174,864 |
Tgal
|
$0.60 | |
| Water Disposal | $508,573 | 267,233 |
Tgal
|
$1.90 | |
| Other Liquid (non-haz) | $104,918 | 174,864 |
gal
|
$0.60 | |
| TOTAL YEARLY COSTS | $2,472,793 | ||||
| RECOMMENDED SAVINGS* | $116,194 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Personnel Changes Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 3.4111: Use closed cycle process to minimize waste water production | $60,750 | $77,700 |
$(-234.4)
(-6,162)
kWh
|
$(-4.4)
-
kW-mo/yr
|
$21,427
-
Tgal
|
- | $39,562 | - | |
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $29,023 | $49,521 |
$23,862
627,957
kWh
|
$5,161
-
kW-mo/yr
|
- | - | - | - | |
| 03 | 2.2621: Modify refrigeration system to operate at a lower pressure | $11,478 | $1,000 |
$9,437
248,352
kWh
|
$2,041
-
kW-mo/yr
|
- | - | - | - | |
| 04 | 2.2621: Modify refrigeration system to operate at a lower pressure | $2,664 | $1,000 |
$2,190
57,621
kWh
|
$474
-
kW-mo/yr
|
- | - | - | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,418 | $45,772 |
$4,726
124,361
kWh
|
$1,022
-
kW-mo/yr
|
- | $1,084 | - | $1,586 | |
| 06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,210 | - |
$1,390
36,592
kWh
|
$820
-
kW-mo/yr
|
- | - | - | - | |
| 07 | 2.4224: Upgrade controls on compressors | $1,651 | $7,363 |
$1,357
35,714
kWh
|
$294
-
kW-mo/yr
|
- | - | - | - | |
| TOTAL RECOMMENDED | $116,194 | $182,356 |
$42,728
1,124,435
kWh
|
$9,808
-
kW-mo/yr
|
$21,427
-
Tgal
|
$1,084 | $39,562 | $1,586 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Personnel Changes Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs