ITAC Assessment: SD0344
ITAC logo
ITAC Assessment: SD0344
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Springs
NAICS 332613: Spring Manufacturing
SIC 3493: Steel Springs, Except Wire
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 100,000
ft2
Annual Production 637,500
pieces
Production Hrs. Annual 4,080
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $134,601 1,149,039
kWh
Electricity Demand $48,819 6,066
kW-mo/yr
Natural Gas $15,218 2,069
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $64,931 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $49,484

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $42,981 $35,875 $42,981
367,049
kWh
- - -
02 2.1133: Adjust burners for efficient operation $6,983 $7,700 - - $6,983
-
MMBtu
-
03 2.7141: Lower light fixtures in high ceiling areas $8,464 $27,829 $6,395
54,615
kWh
$2,069
-
kW-mo/yr
- -
04 2.4133: Use most efficient type of electric motors $1,104 $440 $74
632
kWh
$1,030
-
kW-mo/yr
- -
05 3.6193: Install equipment (eg compactor) to reduce disposal costs $5,399 $18,500 - - - $5,399
-
lb
TOTAL RECOMMENDED $64,931 $90,344 $49,450
422,296
kWh
$3,099
-
kW-mo/yr
$6,983
-
MMBtu
$5,399
-
lb
TOTAL IMPLEMENTED $49,484 $54,815 $43,055
367,681
kWh
$1,030
-
kW-mo/yr
- $5,399
-
lb
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs