ITAC Assessment: OR0705
ITAC logo
ITAC Assessment: OR0705
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Treated Wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 2,875,000
ft2
Annual Production 59,495,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $239,426 4,935,600
kWh
Electricity Demand $97,558 16,632
kW-mo/yr
Electricity Fees $32,140 -
Natural Gas $10,326 1,131
MMBtu
Waste Disposal Costs
Water Usage $48,754 17,549
Tgal
Solid Waste (non-haz) $74,346 1,892,000
lb
TOTAL YEARLY COSTS $502,550
RECOMMENDED SAVINGS* $1,860,049 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,817,773

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Gas Savings
01 3.3128: Utilize other methods to remove contaminants $1,817,773 $8,000,000 $(-446,439.0)
(-9,203,031)
kWh
$(-120,994.0)
-
kW-mo/yr
$(-186,723.0)
-
MMBtu
$2,571,929
-
MMBtu
02 2.1116: Improve combustion control capability $6,117 $13,300 $1,375
28,354
kWh
- $4,742
-
MMBtu
-
03 2.6231: Utilize controls to operate equipment only when needed $1,640 $5,820 $1,640
33,803
kWh
- - -
04 2.4322: Use or replace with energy efficient substitutes $34,519 $150,000 $28,190
581,124
kWh
$6,329
-
kW-mo/yr
- -
TOTAL RECOMMENDED $1,860,049 $8,169,120 $(-415,234.0)
(-8,559,750)
kWh
$(-114,665.0)
-
kW-mo/yr
$(-181,981.0)
-
MMBtu
$2,571,929
-
MMBtu
TOTAL IMPLEMENTED $1,817,773 $8,000,000 $(-446,439.0)
(-9,203,031)
kWh
$(-120,994.0)
-
kW-mo/yr
$(-186,723.0)
-
MMBtu
$2,571,929
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs