Assessment Year | 2018 |
---|---|
Principal Product | Treated Wastewater |
NAICS | 221320: Sewage Treatment Facilities |
SIC | 4952: Sewerage Systems |
Sales Range | $10 M to 50M |
# of Employees | 80 |
Plant Area |
2,875,000
ft2
|
Annual Production | 59,495,000
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $239,426 | 4,935,600 |
kWh
|
$0.049 | |
Electricity Demand | $97,558 | 16,632 |
kW-mo/yr
|
$5.87 | |
Electricity Fees | $32,140 | - |
|
- | |
Natural Gas | $10,326 | 1,131 |
MMBtu
|
$9.13 | |
Waste Disposal Costs | |||||
Water Usage | $48,754 | 17,549 |
Tgal
|
$2.78 | |
Solid Waste (non-haz) | $74,346 | 1,892,000 |
lb
|
$0.039 | |
TOTAL YEARLY COSTS | $502,550 | ||||
RECOMMENDED SAVINGS* | $1,860,049 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $1,817,773 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 3.3128: Utilize other methods to remove contaminants | $1,817,773 | $8,000,000 |
$(-446,439.0)
(-9,203,031)
kWh
|
$(-120,994.0)
-
kW-mo/yr
|
$(-186,723.0)
-
MMBtu
|
$2,571,929
-
MMBtu
|
|
02 | 2.1116: Improve combustion control capability | $6,117 | $13,300 |
$1,375
28,354
kWh
|
- |
$4,742
-
MMBtu
|
- | |
03 | 2.6231: Utilize controls to operate equipment only when needed | $1,640 | $5,820 |
$1,640
33,803
kWh
|
- | - | - | |
04 | 2.4322: Use or replace with energy efficient substitutes | $34,519 | $150,000 |
$28,190
581,124
kWh
|
$6,329
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $1,860,049 | $8,169,120 |
$(-415,234.0)
(-8,559,750)
kWh
|
$(-114,665.0)
-
kW-mo/yr
|
$(-181,981.0)
-
MMBtu
|
$2,571,929
-
MMBtu
|
||
TOTAL IMPLEMENTED | $1,817,773 | $8,000,000 |
$(-446,439.0)
(-9,203,031)
kWh
|
$(-120,994.0)
-
kW-mo/yr
|
$(-186,723.0)
-
MMBtu
|
$2,571,929
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs