ITAC Assessment: OR0698
ITAC logo
ITAC Assessment: OR0698
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Bus Maintenance
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $5
M
to 10
M
# of Employees 320
Plant Area 94,600
ft2
Annual Production 107
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $80,852 1,814,600
kWh
Electricity Demand $19,387 3,378
kW-mo/yr
Electricity Fees $2,131 -
Natural Gas $53,575 6,504
MMBtu
Waste Disposal Costs
Water Usage $15,922 6,108,916
Tgal
TOTAL YEARLY COSTS $171,867
RECOMMENDED SAVINGS* $66,197 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $33,983

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 4.111: Add equipment/ operators to reduce production bottleneck $32,214 $597 - - - $32,214
02 2.3132: Recharge batteries on during off-peak demand periods $18,374 $9,440 - $18,374
-
kW-mo/yr
- -
03 2.7234: Use heat pump for space conditioning $12,461 $22,850 $15,498
358,176
kWh
- $(-3,037.0)
-
MMBtu
-
04 2.6231: Utilize controls to operate equipment only when needed $3,148 $325 $1,073
24,790
kWh
$2,075
-
kW-mo/yr
- -
TOTAL RECOMMENDED $66,197 $33,212 $16,571
382,966
kWh
$20,449
-
kW-mo/yr
$(-3,037.0)
-
MMBtu
$32,214
TOTAL IMPLEMENTED $33,983 $32,615 $16,571
382,966
kWh
$20,449
-
kW-mo/yr
$(-3,037.0)
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs