Assessment Year | 2018 |
---|---|
Principal Product | Bus Maintenance |
NAICS | 336390: Other Motor Vehicle Parts Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $5 M to 10M |
# of Employees | 320 |
Plant Area |
94,600
ft2
|
Annual Production | 107
pieces
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $80,852 | 1,814,600 |
kWh
|
$0.045 | |
Electricity Demand | $19,387 | 3,378 |
kW-mo/yr
|
$5.74 | |
Electricity Fees | $2,131 | - |
|
- | |
Natural Gas | $53,575 | 6,504 |
MMBtu
|
$8.24 | |
Waste Disposal Costs | |||||
Water Usage | $15,922 | 6,108,916 |
Tgal
|
$0.003 | |
TOTAL YEARLY COSTS | $171,867 | ||||
RECOMMENDED SAVINGS* | $66,197 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $33,983 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 4.111: Add equipment/ operators to reduce production bottleneck | $32,214 | $597 | - | - | - | $32,214 | |
02 | 2.3132: Recharge batteries on during off-peak demand periods | $18,374 | $9,440 | - |
$18,374
-
kW-mo/yr
|
- | - | |
03 | 2.7234: Use heat pump for space conditioning | $12,461 | $22,850 |
$15,498
358,176
kWh
|
- |
$(-3,037.0)
-
MMBtu
|
- | |
04 | 2.6231: Utilize controls to operate equipment only when needed | $3,148 | $325 |
$1,073
24,790
kWh
|
$2,075
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $66,197 | $33,212 |
$16,571
382,966
kWh
|
$20,449
-
kW-mo/yr
|
$(-3,037.0)
-
MMBtu
|
$32,214 | ||
TOTAL IMPLEMENTED | $33,983 | $32,615 |
$16,571
382,966
kWh
|
$20,449
-
kW-mo/yr
|
$(-3,037.0)
-
MMBtu
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs