ITAC Assessment: OR0685
ITAC logo
ITAC Assessment: OR0685
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Asphalt, MDO
NAICS 324121: Asphalt Paving Mixture and Block Manufacturing
SIC 2951: Asphalt Paving Mixtures and Blocks
Sales Range $10
M
to 50
M
# of Employees 15
Plant Area 1,742,000
ft2
Annual Production 6,859,211
bbl
Production Hrs. Annual 8,760
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $256,549 3,826,800
kWh
Electricity Demand $34,151 9,189
kW-mo/yr
Electricity Fees $135 -
Natural Gas $1,092,155 254,076
MMBtu
Waste Disposal Costs
Water Usage $92,579 22,406,363
Tgal
TOTAL YEARLY COSTS $1,475,569
RECOMMENDED SAVINGS* $562,031 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 2.2135: Repair and eliminate steam leaks $380,108 $83,637 - - $299,644
-
MMBtu
$80,464 -
02 2.2511: Insulate bare equipment $90,626 $10,470 - - $90,626
-
MMBtu
- -
03 2.6218: Turn off equipment when not in use $27,005 $27,335 $23,280
342,902
kWh
$3,725
-
kW-mo/yr
- - -
04 2.1113: Reduce combustion air flow to optimum $59,155 $90,400 $5,472
80,597
kWh
- $53,683
-
MMBtu
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,442 $2,012 $378
5,292
kWh
$31
-
kW-mo/yr
- - $2,033
06 2.4222: Install adequate dryers on air lines to eliminate blowdown $2,695 $10,499 $2,695
39,695
kWh
- - - -
TOTAL RECOMMENDED $562,031 $224,353 $31,825
468,486
kWh
$3,756
-
kW-mo/yr
$443,953
-
MMBtu
$80,464 $2,033
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Raw Material Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs