Assessment Year | 2017 |
---|---|
Principal Product | Asphalt, MDO |
NAICS | 324121: Asphalt Paving Mixture and Block Manufacturing |
SIC | 2951: Asphalt Paving Mixtures and Blocks |
Sales Range | $10 M to 50M |
# of Employees | 15 |
Plant Area |
1,742,000
ft2
|
Annual Production | 6,859,211
bbl
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $256,549 | 3,826,800 |
kWh
|
$0.067 | |
Electricity Demand | $34,151 | 9,189 |
kW-mo/yr
|
$3.72 | |
Electricity Fees | $135 | - |
|
- | |
Natural Gas | $1,092,155 | 254,076 |
MMBtu
|
$4.30 | |
Waste Disposal Costs | |||||
Water Usage | $92,579 | 22,406,363 |
Tgal
|
$0.004 | |
TOTAL YEARLY COSTS | $1,475,569 | ||||
RECOMMENDED SAVINGS* | $562,031 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Primary Raw Material Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2135: Repair and eliminate steam leaks | $380,108 | $83,637 | - | - |
$299,644
-
MMBtu
|
$80,464 | - | |
02 | 2.2511: Insulate bare equipment | $90,626 | $10,470 | - | - |
$90,626
-
MMBtu
|
- | - | |
03 | 2.6218: Turn off equipment when not in use | $27,005 | $27,335 |
$23,280
342,902
kWh
|
$3,725
-
kW-mo/yr
|
- | - | - | |
04 | 2.1113: Reduce combustion air flow to optimum | $59,155 | $90,400 |
$5,472
80,597
kWh
|
- |
$53,683
-
MMBtu
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,442 | $2,012 |
$378
5,292
kWh
|
$31
-
kW-mo/yr
|
- | - | $2,033 | |
06 | 2.4222: Install adequate dryers on air lines to eliminate blowdown | $2,695 | $10,499 |
$2,695
39,695
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $562,031 | $224,353 |
$31,825
468,486
kWh
|
$3,756
-
kW-mo/yr
|
$443,953
-
MMBtu
|
$80,464 | $2,033 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Primary Raw Material Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs