| Assessment Year | 2019 |
|---|---|
| Principal Product | Automotive Parts Finisher |
| NAICS | 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring |
| SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
| Sales Range | $1 M to 5M |
| # of Employees | 20 |
| Plant Area |
30,000
ft2
|
| Annual Production | 1,100,000
lb
|
| Production Hrs. Annual | 4,492
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $23,076 | 618,200 |
kWh
|
$0.037 |
| Electricity Demand | $34,159 | 5,936 |
kW-mo/yr
|
$5.75 |
| Electricity Fees | $8,131 | - |
|
- |
| Natural Gas | $6,470 | 1,156 |
MMBtu
|
$5.60 |
| TOTAL YEARLY COSTS | $71,836 | |||
| RECOMMENDED SAVINGS* | $7,982 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $919 | $689 |
$664
16,611
kWh
|
$255
-
kW-mo/yr
|
|
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,608 | $4,300 |
$2,580
64,510
kWh
|
$1,028
-
kW-mo/yr
|
|
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,094 | $167 |
$738
18,452
kWh
|
$356
-
kW-mo/yr
|
|
| 04 | 2.4221: Install compressor air intakes in coolest locations | $343 | $1,200 |
$232
5,804
kWh
|
$111
-
kW-mo/yr
|
|
| 05 | 2.6218: Turn off equipment when not in use | $1,367 | - |
$1,367
34,191
kWh
|
- | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $650 | $60 |
$369
9,226
kWh
|
$281
-
kW-mo/yr
|
|
| TOTAL RECOMMENDED | $7,982 | $6,416 |
$5,951
148,795
kWh
|
$2,031
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs