ITAC Assessment: IC0226
ITAC logo
ITAC Assessment: IC0226
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Automotive Parts Finisher
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $1
M
to 5
M
# of Employees 20
Plant Area 30,000
ft2
Annual Production 1,100,000
lb
Production Hrs. Annual 4,492
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $23,076 618,200
kWh
Electricity Demand $34,159 5,936
kW-mo/yr
Electricity Fees $8,131 -
Natural Gas $6,470 1,156
MMBtu
TOTAL YEARLY COSTS $71,836
RECOMMENDED SAVINGS* $7,982 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $919 $689 $664
16,611
kWh
$255
-
kW-mo/yr
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,608 $4,300 $2,580
64,510
kWh
$1,028
-
kW-mo/yr
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,094 $167 $738
18,452
kWh
$356
-
kW-mo/yr
04 2.4221: Install compressor air intakes in coolest locations $343 $1,200 $232
5,804
kWh
$111
-
kW-mo/yr
05 2.6218: Turn off equipment when not in use $1,367 - $1,367
34,191
kWh
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $650 $60 $369
9,226
kWh
$281
-
kW-mo/yr
TOTAL RECOMMENDED $7,982 $6,416 $5,951
148,795
kWh
$2,031
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs