| Assessment Year | 2015 |
|---|---|
| Principal Product | Containerboard - Paper |
| NAICS | 322130: Paperboard Mills |
| SIC | 2631: Paperboard Mills |
| Sales Range | $100 M to 500M |
| # of Employees | 290 |
| Plant Area |
4,356,000
ft2
|
| Annual Production | 590,000
units
|
| Production Hrs. Annual | 8,592
hrs
|
| Location (State) | Oregon |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $19,617,984 | 424,649,000 |
kWh
|
$0.046 |
| Natural Gas | $9,438,835 | 1,958,098 |
MMBtu
|
$4.82 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $422,665 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $121,433 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.2511: Insulate bare equipment | $219,206 | $131,538 | - |
$219,206
-
MMBtu
|
- | - | |
| 02 | 2.4239: Eliminate or reduce compressed air usage | $53,670 | $26,776 |
$69,450
1,845,116
kWh
|
- | $(-15,780.0) | - | |
| 03 | 2.4226: Use / purchase optimum sized compressor | $93,377 | $70,598 |
$45,877
1,218,837
kWh
|
- | $47,500 | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $17,420 | $66,806 |
$12,315
327,187
kWh
|
- | $2,626 | $2,479 | |
| 05 | 2.4239: Eliminate or reduce compressed air usage | $10,636 | $8,812 |
$10,636
282,565
kWh
|
- | - | - | |
| 06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $28,356 | $73,500 |
$28,356
753,352
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $422,665 | $378,030 |
$166,634
4,427,057
kWh
|
$219,206
-
MMBtu
|
$34,346 | $2,479 | ||
| TOTAL IMPLEMENTED | $121,433 | $146,216 |
$68,828
1,828,589
kWh
|
- | $50,126 | $2,479 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs