ITAC Assessment: OR0645
ITAC logo
ITAC Assessment: OR0645
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Containerboard - Paper
NAICS 322130: Paperboard Mills
SIC 2631: Paperboard Mills
Sales Range $100
M
to 500
M
# of Employees 290
Plant Area 4,356,000
ft2
Annual Production 590,000
units
Production Hrs. Annual 8,592
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $19,617,984 424,649,000
kWh
Natural Gas $9,438,835 1,958,098
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $422,665 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $121,433

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.2511: Insulate bare equipment $219,206 $131,538 - $219,206
-
MMBtu
- -
02 2.4239: Eliminate or reduce compressed air usage $53,670 $26,776 $69,450
1,845,116
kWh
- $(-15,780.0) -
03 2.4226: Use / purchase optimum sized compressor $93,377 $70,598 $45,877
1,218,837
kWh
- $47,500 -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $17,420 $66,806 $12,315
327,187
kWh
- $2,626 $2,479
05 2.4239: Eliminate or reduce compressed air usage $10,636 $8,812 $10,636
282,565
kWh
- - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $28,356 $73,500 $28,356
753,352
kWh
- - -
TOTAL RECOMMENDED $422,665 $378,030 $166,634
4,427,057
kWh
$219,206
-
MMBtu
$34,346 $2,479
TOTAL IMPLEMENTED $121,433 $146,216 $68,828
1,828,589
kWh
- $50,126 $2,479
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs