ITAC Assessment: OR0634
ITAC logo
ITAC Assessment: OR0634
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Dimensional Lumber
NAICS 321113: Sawmills
SIC 2421: Sawmills and Planing Mills, General
Sales Range $100
M
to 500
M
# of Employees 450
Plant Area 450,000
ft2
Annual Production 120,000,000
units
Production Hrs. Annual 3,120
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,375,810 26,073,312
kWh
Electricity Demand $506,626 69,593
kW-mo/yr
LPG $46,361 2,568
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $240,857 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4224: Upgrade controls on compressors $102,712 $87,114 $94,527
1,793,677
kWh
$8,185
-
kW-mo/yr
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $6,951 - $3,913
74,248
kWh
$3,038
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $101,299 $258,445 $70,693
1,341,432
kWh
$12,516
-
kW-mo/yr
$2,870 $15,220
04 2.6218: Turn off equipment when not in use $4,747 $1,502 $4,747
90,067
kWh
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,923 $1,344 $2,923
55,458
kWh
- - -
06 2.4112: Install soft-start to eliminate nuisance trips $22,225 - $23,225
440,710
kWh
- $(-1,000.0) -
TOTAL RECOMMENDED $240,857 $348,405 $200,028
3,795,592
kWh
$23,739
-
kW-mo/yr
$1,870 $15,220
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs