ITAC Assessment: OR0633
ITAC logo
ITAC Assessment: OR0633
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Plywood Panels
NAICS 321212: Softwood Veneer and Plywood Manufacturing
SIC 2436: Softwood Veneer and Plywood
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area 900,000
ft2
Annual Production 2,000,000
lb
Production Hrs. Annual 6,864
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $570,810 14,478,640
kWh
Electricity Demand $240,492 35,978
kW-mo/yr
Natural Gas $195,809 36,304
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $510,314 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Product Savings
01 2.4224: Upgrade controls on compressors $107,219 $4,630 $87,003
2,301,659
kWh
$20,216
-
kW-mo/yr
- -
02 4.122: Develop standard procedures to improve internal yields $392,710 $105,114 - - - $392,710
03 2.2511: Insulate bare equipment $2,456 $1,771 - - $2,456
-
MMBtu
-
04 2.4226: Use / purchase optimum sized compressor $7,929 $4,920 $7,929
209,751
kWh
- - -
TOTAL RECOMMENDED $510,314 $116,435 $94,932
2,511,410
kWh
$20,216
-
kW-mo/yr
$2,456
-
MMBtu
$392,710
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs