| Assessment Year | 2014 |
|---|---|
| Principal Product | Fountain Syrup |
| NAICS | 311930: Flavoring Syrup and Concentrate Manufacturing |
| SIC | 2087: Flavoring Extracts and Flavoring Syrups, Not Elsewhere Classified |
| Sales Range | less than $500 k |
| # of Employees | 36 |
| Plant Area |
82,000
ft2
|
| Annual Production | 12,166,435
units
|
| Production Hrs. Annual | 2,250
hrs
|
| Location (State) | Oregon |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $81,194 | 1,261,000 |
kWh
|
$0.064 |
| Electricity Demand | $22,583 | 4,151 |
kW-mo/yr
|
$5.44 |
| Electricity Fees | $13,172 | - |
|
- |
| Natural Gas | $58,759 | 9,350 |
MMBtu
|
$6.28 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $12,287 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $3,367 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.1116: Improve combustion control capability | $3,802 | - |
$344
5,070
kWh
|
- |
$3,458
-
MMBtu
|
- | - | |
| 02 | 2.7135: Install occupancy sensors | $2,497 | $2,837 |
$2,126
31,313
kWh
|
- | - | $186 | $185 | |
| 03 | 2.2437: Recover waste heat from equipment | $2,285 | - |
$1,128
16,609
kWh
|
- |
$1,157
-
MMBtu
|
- | - | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $870 | $500 |
$615
9,059
kWh
|
$255
-
kW-mo/yr
|
- | - | - | |
| 05 | 2.4224: Upgrade controls on compressors | $2,833 | - |
$3,459
50,941
kWh
|
$(-626.0)
-
kW-mo/yr
|
- | - | - | |
| TOTAL RECOMMENDED | $12,287 | $3,337 |
$7,672
112,992
kWh
|
$(-371.0)
-
kW-mo/yr
|
$4,615
-
MMBtu
|
$186 | $185 | ||
| TOTAL IMPLEMENTED | $3,367 | $3,337 |
$2,741
40,372
kWh
|
$255
-
kW-mo/yr
|
- | $186 | $185 | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs