ITAC Assessment: OR0632
ITAC logo
ITAC Assessment: OR0632
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Fountain Syrup
NAICS 311930: Flavoring Syrup and Concentrate Manufacturing
SIC 2087: Flavoring Extracts and Flavoring Syrups, Not Elsewhere Classified
Sales Range less than $500
k
# of Employees 36
Plant Area 82,000
ft2
Annual Production 12,166,435
units
Production Hrs. Annual 2,250
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $81,194 1,261,000
kWh
Electricity Demand $22,583 4,151
kW-mo/yr
Electricity Fees $13,172 -
Natural Gas $58,759 9,350
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,287 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,367

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.1116: Improve combustion control capability $3,802 - $344
5,070
kWh
- $3,458
-
MMBtu
- -
02 2.7135: Install occupancy sensors $2,497 $2,837 $2,126
31,313
kWh
- - $186 $185
03 2.2437: Recover waste heat from equipment $2,285 - $1,128
16,609
kWh
- $1,157
-
MMBtu
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $870 $500 $615
9,059
kWh
$255
-
kW-mo/yr
- - -
05 2.4224: Upgrade controls on compressors $2,833 - $3,459
50,941
kWh
$(-626.0)
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $12,287 $3,337 $7,672
112,992
kWh
$(-371.0)
-
kW-mo/yr
$4,615
-
MMBtu
$186 $185
TOTAL IMPLEMENTED $3,367 $3,337 $2,741
40,372
kWh
$255
-
kW-mo/yr
- $186 $185
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs