ITAC Assessment: OR0627
ITAC logo
ITAC Assessment: OR0627
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Wastewater Treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 67
Plant Area 653,400
ft2
Annual Production 4,197,500
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $724,531 11,365,729
kWh
Electricity Demand $174,128 24,557
kW-mo/yr
Electricity Fees $95,182 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $213,330 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $145,747

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.6218: Turn off equipment when not in use $28,066 - $28,066
403,710
kWh
- - -
02 2.6218: Turn off equipment when not in use $54,087 - $46,710
671,892
kWh
$7,377
-
kW-mo/yr
- -
03 4.632: Change operating conditions $30,875 - $25,955
373,348
kWh
$4,920
-
kW-mo/yr
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $7,799 $1,000 $5,926
85,240
kWh
$1,873
-
kW-mo/yr
- -
05 2.4131: Size electric motors for peak operating efficiency $21,245 $23,300 $21,245
305,561
kWh
- - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,770 $22,011 - $10,770
-
kW-mo/yr
- -
07 2.4224: Upgrade controls on compressors $10,323 $17,350 $6,271
90,202
kWh
$4,052
-
kW-mo/yr
- -
08 2.4322: Use or replace with energy efficient substitutes $32,937 $129,750 $28,811
414,425
kWh
$4,126
-
kW-mo/yr
- -
09 2.4133: Use most efficient type of electric motors $2,631 $4,602 $2,076
29,857
kWh
$544
-
kW-mo/yr
- $11
10 2.7134: Use photocell controls $3,741 $7,191 $2,162
31,092
kWh
$14
-
kW-mo/yr
$532 $1,033
11 2.7142: Utilize higher efficiency lamps and/or ballasts $10,856 $39,597 $6,667
95,899
kWh
$2,196
-
kW-mo/yr
$250 $1,743
TOTAL RECOMMENDED $213,330 $244,801 $173,889
2,501,226
kWh
$35,872
-
kW-mo/yr
$782 $2,787
TOTAL IMPLEMENTED $145,747 $65,138 $121,757
1,751,383
kWh
$20,432
-
kW-mo/yr
$782 $2,776
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs