| Assessment Year | 1991 |
|---|---|
| Principal Product | ROBOTIC WELDING EQUIP. |
| NAICS |
n/a
|
| SIC | 3548: Electric and Gas Welding and Soldering Equipment |
| Sales Range | $10 M to 50M |
| # of Employees | 280 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 4,420
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $84,536 | 1,719,812 |
kWh
|
$0.049 |
| Natural Gas | $9,778 | 2,575 |
MMBtu
|
$3.80 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $8,974 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $8,974 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.8121: Apply for tax-free status for energy purchases | $4,070 | $250 |
$3,617
-
kWh
|
$453
-
MMBtu
|
|
| 02 | 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown | $1,830 | $500 |
$100
7,913
kWh
|
$1,730
-
MMBtu
|
|
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $635 | $550 |
$635
12,896
kWh
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,206 | $1,273 |
$1,206
24,619
kWh
|
- | |
| 05 | 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown | $875 | $600 |
$350
7,034
kWh
|
$525
-
MMBtu
|
|
| 06 | 2.4133: Use most efficient type of electric motors | $133 | $290 |
$133
879
kWh
|
- | |
| 07 | 2.2437: Recover waste heat from equipment | $225 | $610 |
$(-8.0)
(-293)
kWh
|
$233
-
MMBtu
|
|
| TOTAL RECOMMENDED | $8,974 | $4,073 |
$6,033
53,048
kWh
|
$2,941
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $8,974 | $4,073 |
$6,033
53,048
kWh
|
$2,941
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs