ITAC Assessment: CO0223
ITAC logo
ITAC Assessment: CO0223
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product ROBOTIC WELDING EQUIP.
NAICS
n/a
SIC 3548: Electric and Gas Welding and Soldering Equipment
Sales Range $10
M
to 50
M
# of Employees 280
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,420
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $84,536 1,719,812
kWh
Natural Gas $9,778 2,575
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,974 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,974

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.8121: Apply for tax-free status for energy purchases $4,070 $250 $3,617
-
kWh
$453
-
MMBtu
02 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $1,830 $500 $100
7,913
kWh
$1,730
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $635 $550 $635
12,896
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,206 $1,273 $1,206
24,619
kWh
-
05 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $875 $600 $350
7,034
kWh
$525
-
MMBtu
06 2.4133: Use most efficient type of electric motors $133 $290 $133
879
kWh
-
07 2.2437: Recover waste heat from equipment $225 $610 $(-8.0)
(-293)
kWh
$233
-
MMBtu
TOTAL RECOMMENDED $8,974 $4,073 $6,033
53,048
kWh
$2,941
-
MMBtu
TOTAL IMPLEMENTED $8,974 $4,073 $6,033
53,048
kWh
$2,941
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs