ITAC Assessment: OR0620
ITAC logo
ITAC Assessment: OR0620
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Production Units
NAICS 335991: Carbon and Graphite Product Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 450
Plant Area 160,000
ft2
Annual Production 365,689
units
Production Hrs. Annual 8,760
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $604,006 6,863,552
kWh
LPG $251,657 24,348
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $80,581 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Administrative Changes Savings
01 4.231: Purchase equipment instead of leasing $50,574 $68,750 $1,314
19,695
kWh
- $49,260
02 2.7314: Reduce ventilation air $28,525 $3,200 $3,177
47,619
kWh
$25,348
-
MMBtu
-
03 2.2511: Insulate bare equipment $456 $163 - $456
-
MMBtu
-
04 4.454: Modify startup/shutdown times $442 $481 $442
6,627
kWh
- -
05 2.7313: Recycle air for heating, ventilation and air conditioning $584 $2,554 $584
8,760
kWh
- -
TOTAL RECOMMENDED $80,581 $75,148 $5,517
82,701
kWh
$25,804
-
MMBtu
$49,260
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs