ITAC Assessment: OR0615
ITAC logo
ITAC Assessment: OR0615
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Paper
NAICS 322121: Paper (except Newsprint) Mills
SIC 2621: Paper Mills
Sales Range $10
M
to 50
M
# of Employees 55
Plant Area 135,738
ft2
Annual Production 41,630
units
Production Hrs. Annual 8,760
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $971,957 15,527,455
kWh
Electricity Demand $189,896 25,990
kW-mo/yr
Electricity Fees $32,044 -
Natural Gas $1,092,324 192,102
MMBtu
Fuel Oil #2 $27,681 981
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $893,479 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $87,511

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings
01 4.641: Eliminate shutdowns of controls due to overheating $24,283 $1,000 - - - $19,377
-
MMBtu
- $4,906 -
02 2.4131: Size electric motors for peak operating efficiency $48,896 $68,866 $40,081
640,264
kWh
$6,315
-
kW-mo/yr
- - $2,500 - -
03 4.114: Add/modify equipment to improve drying process $791,616 $300,000 $(-977.0)
(-15,604)
kWh
$(-154.0)
-
kW-mo/yr
$112,204
-
MMBtu
- - - $680,543
04 2.6231: Utilize controls to operate equipment only when needed $9,731 $17,127 $9,731
155,444
kWh
- - - - - -
05 2.4322: Use or replace with energy efficient substitutes $14,352 $36,600 $12,399
198,060
kWh
$1,953
-
kW-mo/yr
- - - - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,601 $4,986 $4,601
73,491
kWh
- - - - - -
TOTAL RECOMMENDED $893,479 $428,579 $65,835
1,051,655
kWh
$8,114
-
kW-mo/yr
$112,204
-
MMBtu
$19,377
-
MMBtu
$2,500 $4,906 $680,543
TOTAL IMPLEMENTED $87,511 $91,979 $54,413
869,199
kWh
$6,315
-
kW-mo/yr
- $19,377
-
MMBtu
$2,500 $4,906 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs