Assessment Year | 2013 |
---|---|
Principal Product | Paper |
NAICS | 322121: Paper (except Newsprint) Mills |
SIC | 2621: Paper Mills |
Sales Range | $10 M to 50M |
# of Employees | 55 |
Plant Area |
135,738
ft2
|
Annual Production | 41,630
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $971,957 | 15,527,455 |
kWh
|
$0.063 |
Electricity Demand | $189,896 | 25,990 |
kW-mo/yr
|
$7.31 |
Electricity Fees | $32,044 | - |
|
- |
Natural Gas | $1,092,324 | 192,102 |
MMBtu
|
$5.69 |
Fuel Oil #2 | $27,681 | 981 |
MMBtu
|
$28.21 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $893,479 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $87,511 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #2 Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 4.641: Eliminate shutdowns of controls due to overheating | $24,283 | $1,000 | - | - | - |
$19,377
-
MMBtu
|
- | $4,906 | - | |
02 | 2.4131: Size electric motors for peak operating efficiency | $48,896 | $68,866 |
$40,081
640,264
kWh
|
$6,315
-
kW-mo/yr
|
- | - | $2,500 | - | - | |
03 | 4.114: Add/modify equipment to improve drying process | $791,616 | $300,000 |
$(-977.0)
(-15,604)
kWh
|
$(-154.0)
-
kW-mo/yr
|
$112,204
-
MMBtu
|
- | - | - | $680,543 | |
04 | 2.6231: Utilize controls to operate equipment only when needed | $9,731 | $17,127 |
$9,731
155,444
kWh
|
- | - | - | - | - | - | |
05 | 2.4322: Use or replace with energy efficient substitutes | $14,352 | $36,600 |
$12,399
198,060
kWh
|
$1,953
-
kW-mo/yr
|
- | - | - | - | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,601 | $4,986 |
$4,601
73,491
kWh
|
- | - | - | - | - | - | |
TOTAL RECOMMENDED | $893,479 | $428,579 |
$65,835
1,051,655
kWh
|
$8,114
-
kW-mo/yr
|
$112,204
-
MMBtu
|
$19,377
-
MMBtu
|
$2,500 | $4,906 | $680,543 | ||
TOTAL IMPLEMENTED | $87,511 | $91,979 |
$54,413
869,199
kWh
|
$6,315
-
kW-mo/yr
|
- |
$19,377
-
MMBtu
|
$2,500 | $4,906 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #2 Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs