Assessment Year | 2017 |
---|---|
Principal Product | Storage Tank fittings and accessories and construction castings |
NAICS | 331511: Iron Foundries |
SIC | 3321: Gray and Ductile Iron Foundries |
Sales Range | $5 M to 10M |
# of Employees | 42 |
Plant Area |
175,000
ft2
|
Annual Production | 3,000
ton
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $43,468 | 439,950 |
kWh
|
$0.099 |
Electricity Demand | $11,520 | 1,575 |
kW-mo/yr
|
$7.31 |
Electricity Fees | $827 | - |
|
- |
Natural Gas | $48,503 | 7,360 |
MMBtu
|
$6.59 |
TOTAL YEARLY COSTS | $104,318 | |||
RECOMMENDED SAVINGS* | $6,817 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,157 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $2,978 | $2,200 |
$2,064
20,887
kWh
|
$914
-
kW-mo/yr
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,705 | $1,263 |
$1,882
19,053
kWh
|
$883
-
kW-mo/yr
|
- | $(-60.0) | |
03 | 2.2511: Insulate bare equipment | $474 | $663 | - | - |
$474
-
MMBtu
|
- | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $355 | $300 |
$245
2,483
kWh
|
$110
-
kW-mo/yr
|
- | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $305 | $700 |
$210
2,129
kWh
|
$95
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $6,817 | $5,126 |
$4,401
44,552
kWh
|
$2,002
-
kW-mo/yr
|
$474
-
MMBtu
|
$(-60.0) | ||
TOTAL IMPLEMENTED | $6,157 | $4,126 |
$3,946
39,940
kWh
|
$1,797
-
kW-mo/yr
|
$474
-
MMBtu
|
$(-60.0) |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs