ITAC Assessment: MZ0224
ITAC logo
ITAC Assessment: MZ0224
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Storage Tank fittings and accessories and construction castings
NAICS 331511: Iron Foundries
SIC 3321: Gray and Ductile Iron Foundries
Sales Range $5
M
to 10
M
# of Employees 42
Plant Area 175,000
ft2
Annual Production 3,000
ton
Production Hrs. Annual 2,000
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $43,468 439,950
kWh
Electricity Demand $11,520 1,575
kW-mo/yr
Electricity Fees $827 -
Natural Gas $48,503 7,360
MMBtu
TOTAL YEARLY COSTS $104,318
RECOMMENDED SAVINGS* $6,817 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,157

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.2437: Recover waste heat from equipment $2,978 $2,200 $2,064
20,887
kWh
$914
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,705 $1,263 $1,882
19,053
kWh
$883
-
kW-mo/yr
- $(-60.0)
03 2.2511: Insulate bare equipment $474 $663 - - $474
-
MMBtu
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $355 $300 $245
2,483
kWh
$110
-
kW-mo/yr
- -
05 2.4221: Install compressor air intakes in coolest locations $305 $700 $210
2,129
kWh
$95
-
kW-mo/yr
- -
TOTAL RECOMMENDED $6,817 $5,126 $4,401
44,552
kWh
$2,002
-
kW-mo/yr
$474
-
MMBtu
$(-60.0)
TOTAL IMPLEMENTED $6,157 $4,126 $3,946
39,940
kWh
$1,797
-
kW-mo/yr
$474
-
MMBtu
$(-60.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs