ITAC Assessment: UM0093
ITAC logo
ITAC Assessment: UM0093
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Plastic Bottles and Blow Molded Parts
NAICS
n/a
SIC 3098:
Sales Range $1
M
to 5
M
# of Employees 45
Plant Area 51,500
ft2
Annual Production 2,000,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $39,936 1,181,125
kWh
Electricity Demand $65,175 3,924
kW-mo/yr
Electricity Fees $1,450 -
LPG $16,511 1,830
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,748 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,363

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
01 2.4133: Use most efficient type of electric motors $2,091 $2,882 $1,070
36,049
kWh
$1,021
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,272 $9,062 $1,699
57,444
kWh
$1,573
-
kW-mo/yr
-
03 2.4322: Use or replace with energy efficient substitutes $12,065 $36,247 $12,065
402,110
kWh
- -
04 3.1162: Use less wasteful packaging $4,000 - - - $4,000
-
lb
05 3.1191: Change procedures / equipment / operating conditions $24,320 $24 - - $24,320
-
lb
TOTAL RECOMMENDED $45,748 $48,215 $14,834
495,603
kWh
$2,594
-
kW-mo/yr
$28,320
-
lb
TOTAL IMPLEMENTED $5,363 $11,944 $2,769
93,493
kWh
$2,594
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs