ITAC Assessment: OR0613
ITAC logo
ITAC Assessment: OR0613
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Baked Goods
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 49
Plant Area 40,000
ft2
Annual Production 40,000,000
pieces
Production Hrs. Annual 8,112
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $358,481 5,026,238
kWh
Electricity Demand $65,651 8,856
kW-mo/yr
Electricity Fees $33,247 -
Natural Gas $139,559 20,853
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,138 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,099

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
01 3.5217: Reuse / recycle/ sell paper products $11,140 $5,000 $(-10.0)
(-136)
kWh
- - $7,488
-
lb
$3,662 -
02 2.7135: Install occupancy sensors $3,040 $2,913 $1,967
26,080
kWh
$5
-
kW-mo/yr
- - $69 $999
03 2.4133: Use most efficient type of electric motors $11,262 $36,000 $7,886
104,527
kWh
$1,283
-
kW-mo/yr
- - - $2,093
04 3.5311: Recover and reuse waste material $3,635 $8,000 - - - $3,948
-
lb
$(-313.0) -
05 2.2414: Use waste heat from hot flue gases to preheat $5,364 $17,632 - - $5,364
-
MMBtu
- - -
06 2.7261: Install timers and/or thermostats $991 $95 $991
13,140
kWh
- - - - -
07 2.6241: Reduce temperature of process equipment when on standby $706 $448 $706
9,355
kWh
- - - - -
TOTAL RECOMMENDED $36,138 $70,088 $11,540
152,966
kWh
$1,288
-
kW-mo/yr
$5,364
-
MMBtu
$11,436
-
lb
$3,418 $3,092
TOTAL IMPLEMENTED $24,099 $41,543 $9,573
126,886
kWh
$1,283
-
kW-mo/yr
- $7,488
-
lb
$3,662 $2,093
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs