ITAC Assessment: AS0319
ITAC logo
ITAC Assessment: AS0319
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Brown paper and white plastic grocery bags
NAICS
n/a
SIC 2674: Uncoated Paper and Multiwall Bags
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 130,000
ft2
Annual Production 19,100
ton
Production Hrs. Annual 6,000
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $163,222 3,150,800
kWh
Electricity Demand $15,418 6,448
kW-mo/yr
Electricity Fees $14,679 -
Natural Gas $9,267 1,051
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,641 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,641

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
01 2.4133: Use most efficient type of electric motors $2,602 $3,885 $1,570
45,228
kWh
$1,032
-
kW-mo/yr
- -
02 2.7135: Install occupancy sensors $110 $525 $66
1,888
kWh
$44
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $12,641 $7,690 $7,135
205,553
kWh
$4,690
-
kW-mo/yr
- $816
04 3.5316: Contract a wood pallet recycling company $288 $117 - - $288
-
lb
-
TOTAL RECOMMENDED $15,641 $12,217 $8,771
252,669
kWh
$5,766
-
kW-mo/yr
$288
-
lb
$816
TOTAL IMPLEMENTED $12,641 $7,690 $7,135
205,553
kWh
$4,690
-
kW-mo/yr
- $816
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs