ITAC Assessment: OK1129
ITAC logo
ITAC Assessment: OK1129
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Museum and Art Gallery
NAICS 712110: Museums
SIC 8412: Museums and Art Galleries
Sales Range less than $500
k
# of Employees 22
Plant Area 20,317
ft2
Annual Production 1
units
Production Hrs. Annual 2,496
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $26,654 222,503
kWh
Natural Gas $3,954 586
MMBtu
Waste Disposal Costs
Water Usage $629 165
Tgal
Water Disposal $1,508 165
Tgal
TOTAL YEARLY COSTS $32,745
RECOMMENDED SAVINGS* $7,411 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.9114: Use solar heat to make electricty $4,450 $25,650 $4,450
37,085
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,639 $3,600 $1,639
13,655
kWh
-
03 2.3212: Optimize plant power factor $306 $1,037 - $306
04 2.7232: Replace existing hvac unit with high efficiency model $1,016 $5,830 $1,016
8,467
kWh
-
TOTAL RECOMMENDED $7,411 $36,117 $7,105
59,207
kWh
$306
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs