ITAC Assessment: MO0004
ITAC logo
ITAC Assessment: MO0004
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product MINERAL FIREDOOR CORES
NAICS
n/a
SIC 3295: Minerals and Earths, Ground or Otherwise Treated
Sales Range $10
M
to 50
M
# of Employees 35
Plant Area
n/a
Annual Production 250,000
pieces
Production Hrs. Annual 6,600
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $97,814 1,449,883
kWh
LPG $80,295 24,274
MMBtu
Fuel Oil #2 $96,342 18,200
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,765 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,942

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings
01 2.2443: Re-use or recycle hot or cold process exhaust air $7,823 $5,275 $(-996.0)
(-14,654)
kWh
$8,819
-
MMBtu
02 2.4133: Use most efficient type of electric motors $750 $830 $750
11,137
kWh
-
03 2.2511: Insulate bare equipment $3,990 $1,676 - $3,990
-
MMBtu
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,866 $100 $1,866
27,550
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $1,387 $244 $1,387
20,516
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $949 $86 $949
14,068
kWh
-
TOTAL RECOMMENDED $16,765 $8,211 $3,956
58,617
kWh
$12,809
-
MMBtu
TOTAL IMPLEMENTED $8,942 $2,936 $4,952
73,271
kWh
$3,990
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs