| Assessment Year | 2012 |
|---|---|
| Principal Product | Aluminum master alloy |
| NAICS | 331313: Alumina Refining and Primary Aluminum Production |
| SIC | 3339: Primary Smelting and Refining of Nonferrous Metals, Except Copper and Aluminum |
| Sales Range | $10 M to 50M |
| # of Employees | 49 |
| Plant Area |
69,149
ft2
|
| Annual Production | 17
units
|
| Production Hrs. Annual | 6,720
hrs
|
| Location (State) | Washington |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $124,007 | 10,679,335 |
kWh
|
$0.012 |
| Electricity Demand | $100,259 | 31,274 |
kW-mo/yr
|
$3.21 |
| Electricity Fees | $21,201 | - |
|
- |
| Natural Gas | $177,861 | 34,972 |
MMBtu
|
$5.09 |
| LPG | $20,618 | 681 |
MMBtu
|
$30.26 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $500,089 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $55,420 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Energy Savings | Solid Waste (non-haz) Savings | Gaseous Waste Savings | Primary Raw Material Savings | Primary Product Savings | By-product Production Savings |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 3.1192: Reduce scrap production | $413,713 | $260,000 | - | - | - | - |
$51,354
-
lb
|
$40,000
-
lb
|
$(-95,584.0) | $417,943 | - | |
| 02 | 2.2414: Use waste heat from hot flue gases to preheat | $27,815 | $42,303 | - | - |
$27,815
-
MMBtu
|
- | - | - | - | - | - | |
| 03 | 3.6112: Use filter and drying oven to reduce sludge volume | $40,400 | $70,000 |
$(-303.0)
23,962
kWh
|
$(-348.0)
-
kW-mo/yr
|
- |
$31,051
-
MMBtu
|
$10,000
-
lb
|
- | - | - | - | |
| 04 | 3.5313: Increase amount of waste recovered for resale | $15,020 | - | - | - | - | - |
$13,200
-
lb
|
- | - | - | $1,820 | |
| 05 | 3.1161: Eliminate/reduce an operation | $2,222 | $120 | - | - |
$2,222
-
MMBtu
|
- | - | - | - | - | - | |
| 06 | 2.4224: Upgrade controls on compressors | $919 | $1,805 |
$987
77,996
kWh
|
$(-68.0)
-
kW-mo/yr
|
- | - | - | - | - | - | - | |
| TOTAL RECOMMENDED | $500,089 | $374,228 |
$684
101,958
kWh
|
$(-416.0)
-
kW-mo/yr
|
$30,037
-
MMBtu
|
$31,051
-
MMBtu
|
$74,554
-
lb
|
$40,000
-
lb
|
$(-95,584.0) | $417,943 | $1,820 | ||
| TOTAL IMPLEMENTED | $55,420 | $70,000 |
$(-303.0)
23,962
kWh
|
$(-348.0)
-
kW-mo/yr
|
- |
$31,051
-
MMBtu
|
$23,200
-
lb
|
- | - | - | $1,820 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Energy Savings | Solid Waste (non-haz) Savings | Gaseous Waste Savings | Primary Raw Material Savings | Primary Product Savings | By-product Production Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs